Create New Comment
Herc Rental $2,400 skid for a month Materials 20 % misc as pricing is based on local not Steamboat
- derrickbleeker@atpslandscaping.com , Tuesday, November 11, 2025 - 10:58:57 AM

Click here to toggle this as a critical note

https://www.vrbo.com/4261316?chkin=2026-05-01&chkout=2026-05-28&d1=2026-05-01&d2=2026-05-28&startDate=2026-05-01&endDate=2026-05-28&x_pwa=1&rfrr=HSR&pwa_ts=1762884489296&referrerUrl=aHR0cHM6Ly93d3cudnJiby5jb20vSG90ZWwtU2VhcmNo&useRewards=false&adults=2&regionId=3087&destination=Steamboat%20Springs%2C%20Colorado%2C%20United%20States%20of%20America&destType=MARKET&latLong=40.485531%2C-106.83358&nightly_price=-3%2C188&privacyTrackingState=CAN_TRACK&searchId=1516f9ba-371a-42b5-8689-df3984d3e5bb&sort=RECOMMENDED&top_dp=125&top_cur=USD&userIntent=&selectedRoomType=110156246&selectedRatePlan=00041037080089884439930d64a238e35bb6&expediaPropertyId=110156246
- derrickbleeker@atpslandscaping.com , Tuesday, November 11, 2025 - 11:09:37 AM

Click here to toggle this as a critical note

Design
0 Files
Mapping
0 Files
Pictures
0 Files
Receipts
0 Files
Subcontractors
0 Files





Special Excel Upload Only (Do Not Use)
0 Files

To upload a file, click on a folder above (such as "Design").

 

Images/Files from all other bids from this customer

Design
0 Files
Mapping
0 Files
Pictures
0 Files
Receipts
0 Files
Subcontractors
0 Files

TODO: Charts can go here (wait for when we do the reports, and steal the partial view)

I hear it's amazing when the famous purple stuffed worm in flap-jaw space with the tuning fork does a raw blink on Hara-Kiri Rock. I need scissors! 61!

Episode 1 New York. Here in the city where dreams come true and desires rule, something is being bought, sold and thrown away, even as we speak. But behind the scenes of business as usual, the nefarious "J.E. (Junker Expensive Corporation)" lines its already bloated coffers with profits from worthless products. As J.E. swindlers yet another innocent into purchasing high-priced junk, the FBI mobilizes a top-secret task force to put a stop to the menace. Now, the city's best-kept secret spy is out there, briefed and ready to protect the people from "J.E.," the catalogue of conspiracy -- just call him "2.5 (Two-point-five)."

Submit History




Signing platform: Don't use this until Justin says it is ready.

Click here to replace signing links with the new signing platform (you have to do this every time)


Latest proposal sent out:

Sent Item # 3373

Date/Time Submitted Sent By PandaDoc Document ID Link Result Grand Total At the Time
Thursday, November 13, 2025 3:59:56 PM derrickbleeker@atpslandscaping.com dfsAnCSHjJb9D3jfGzEsqi (Click to go to pandadoc->) $ 0.00
Good Afternoon Michael ,

I hope you're doing well. Thank you for the opportunity to assist with the landscaping plans for 946 Pine St. . I've put together a proposal that outlines the scope of work, recommended design elements, and estimated costs.
Estimated Cost:
You can view the full proposal and design concepts here:

Dejong Landscape Proposal

If you have any questions or would like to make adjustments, please don’t hesitate to reach out. I’d be happy to schedule a time to talk through the proposal in more detail.
Thanks again for considering All Terrain as I look forward to working with you!

Best regards,
Derrick Bleeker







Good afternoon Michael ,

Thank you for contacting All Terrain Landscaping.  It was a pleasure meeting with you and discussing the project the other day.
You can review the proposal and quote by opening the link below, and please let me know if you have any questions or need clarification on anything.

Dejong Landscape Proposal

If there are any modifications or adjustments needed, or if the cost is outside of budget, just let me know and we can work together to get the project(s) and budget inline.  If you would like to proceed with the project(s) as is, sign the proposal and return to us.  We do require a deposit of 50%.  Our Office Manager will send a payment link once we receive the signed contract.  Once we receive a deposit the office will release this work order for scheduling.   Within a week after that our Project Manager will contact you to discuss scheduling options.

I look forward to hearing back from you!

Best regards,
Mike Garcia


Good Afternoon Michael ,

I hope all is well. Thank you for taking the time to meet with me and show me around.  Attached in the link below is a proposal for the landscape project we discussed. Please feel free to reach out with any questions you may have as I can make any changes needed. I look forward to hearing from you and have a great rest of your day.

Dejong Landscape Proposal

Kaylor Werner


Thursday, November 13, 2025 4:50:07 PM document.viewed
Thursday, December 4, 2025 6:46:29 AM document.completed
Thursday, December 4, 2025 6:46:29 AM document.completed
Thursday, December 4, 2025 6:46:33 AM document.completed

---------------










Warning! Hitting the below buttons will lock the bid.

Lock Bid and generate proposal on Pandadoc (You will still have to go to pandadoc and send it manually)


Lock Bid and generate proposal with copy-pasteable link (this is also the one for the new signing platform)








Lock the bid

Unlock the bid - Admin Only




Create Bid Price Lock Item - Admin Only








Bid Details

Bid Copied (Don't count in bid tracking)

If this is checked, the bid will not be counted in Bid Tracking, because there is a new bid that was copied from it.

bid_copied

Bid Description

For maintenance bid only


Number of Months: 0.00
Monthly Payment: 0.00

Production rate modifier. Use this to increase or decrease the production rate for everything on the entire bid.

A number higher than 1.0 will result in less labor hours.

A number from 0.0 - 1.0 will result in MORE labor hours.

HindSite

Wow! Fucking Amazing! This does nothing yet though I wonder why...

send_to_hindsite released_to_hindsite hindsite_released_date hindsite_error hindsite_error_verbose

Design Details






Awarded To

This should all get filled out automatically from the signing platform once they sign, you can change it here if it does not.


Use this dropdown as a convenience to insert someone's e-mail into the above awarded to box.

Use the "Submit Date" until told otherwise.





ProfitSeeker!

Run a script to see what the totals will be for each possible percent, useful if you want to stay within the customer's budget:

ProfitSeeker! (Takes a few minutes, don't leave the page!)




MOB Calculator Step-Through

Use this to debug the cost of the MOB.

Scope: Sod

1. Total labor hours for everything outside of MOB items: 33.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (33.00) / Productive_Hours_Per_Day 7.000 = 4.7142857142857142857142857143

4. ROUNDUP(4.7142857142857142857142857143) = 5

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 5 * Travel_Time_Per_Day (0.50) *2 = 5.00 Hours of MOB



Scope: Pavers

1. Total labor hours for everything outside of MOB items: 47.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (47.00) / Productive_Hours_Per_Day 7.000 = 6.7142857142857142857142857143

4. ROUNDUP(6.7142857142857142857142857143) = 7

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 7 * Travel_Time_Per_Day (0.50) *2 = 7.00 Hours of MOB



Scope: Plants

1. Total labor hours for everything outside of MOB items: 14.72

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (14.72) / Productive_Hours_Per_Day 7.000 = 2.1028571428571428571428571429

4. ROUNDUP(2.1028571428571428571428571429) = 3

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 3 * Travel_Time_Per_Day (0.50) *2 = 3.00 Hours of MOB



Scope: Planting Bed

1. Total labor hours for everything outside of MOB items: 63.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (63.00) / Productive_Hours_Per_Day 7.000 = 9

4. ROUNDUP(9) = 9

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 9 * Travel_Time_Per_Day (0.50) *2 = 9.00 Hours of MOB



Scope: Equipment & Mobilization

1. Total labor hours for everything outside of MOB items: 0.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (0.00) / Productive_Hours_Per_Day 7.000 = 0

4. ROUNDUP(0) = 0

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 0 * Travel_Time_Per_Day (0.50) *2 = 0.00 Hours of MOB






Salesman Text Blurb

 

Editable PDF Text Blurb


Copy-pastable Original Text Blurb

Note, this area does not auto-reload, if you just added a line-item, please reload the page

If there is a new generated item that is not in the above text, it is highlighted in red.

Click here to dump below text into above box (Remember to hit save, lower right corner)

All irrigation are done on a time and material basis of $95.00 per man hour plus materials.
Sod
- Installation of 6064 SQFT of blue grass sod
- Rototilling
- Establishment of final grade
- Installation of 19.00 yards of compost
- Installation of 591 linear feet of metal roll top edging


Pavers
- Installation of 444 square feet of pavers (color TBD)
- Installation of 6 bags of polymeric sand
- Installation of 2 tons of sand for base material
- Installation of 17 tons of road base for base material
- Demo, haul off, and disposal of 440 square feet of existing landscape


Plants
- Installation of 26 - 5 gallon shrubs
- Installation of 132 - 1 gallon perennials


Planting Bed
- Installation of 59.50 tons of 1-1/2" grey river rock
- Installation of 5229 square feet of landscape fabric
Installation of Retaining Wall to include:
-Installation of 1.00 tons of road base for base materials
-Installation of 1.00 tons of sand for base materials
-Installation of 116.00 Versalok / Allan block retaining wall blocks
-Installation of 87.00 block caps
-For a 87.00 LF by 1.00 tall retaining wall
- Installation of 116.00 retaining wall blocks
- Installation of 87.00 block caps
- Installation of 1.00 tons of road base for base material
- Installation of 0 tons of 1-1/2" local river rock behind wall for drainage
- Installation of 1.00 tons of sand for base material
- Installation of 30.00 yards of topsoil for berm


Equipment & Mobilization


Make a copy of this Bid->

This will copy the bid, with all its scopes and each item from each of those scopes, into a new bid, inside the same customer.