Create New Comment

No comments on this bid yet.



Design
0 Files
Mapping
0 Files
Pictures
0 Files
Receipts
0 Files
Subcontractors
0 Files





Special Excel Upload Only (Do Not Use)
0 Files

To upload a file, click on a folder above (such as "Design").

 

Images/Files from all other bids from this customer

Design
0 Files
Mapping
0 Files
Pictures
0 Files
Receipts
0 Files
Subcontractors
0 Files

TODO: Charts can go here (wait for when we do the reports, and steal the partial view)

I hear it's amazing when the famous purple stuffed worm in flap-jaw space with the tuning fork does a raw blink on Hara-Kiri Rock. I need scissors! 61!

Episode 1 New York. Here in the city where dreams come true and desires rule, something is being bought, sold and thrown away, even as we speak. But behind the scenes of business as usual, the nefarious "J.E. (Junker Expensive Corporation)" lines its already bloated coffers with profits from worthless products. As J.E. swindlers yet another innocent into purchasing high-priced junk, the FBI mobilizes a top-secret task force to put a stop to the menace. Now, the city's best-kept secret spy is out there, briefed and ready to protect the people from "J.E.," the catalogue of conspiracy -- just call him "2.5 (Two-point-five)."

Submit History




Signing platform: Don't use this until Justin says it is ready.

Click here to replace signing links with the new signing platform (you have to do this every time)


Latest proposal sent out:

Sent Item # 3327

Date/Time Submitted Sent By PandaDoc Document ID Link Result Grand Total At the Time
Monday, October 27, 2025 2:56:40 PM kaylorwerner@atpslandscaping.com ZAPsSnYZWSmJAnyZLaCfMj (Click to go to pandadoc->) $ 0.00
Sent out without a signing link - click on the PandaDoc Document ID Link to add the recipient and send for signing
Monday, October 27, 2025 3:02:04 PM document.sent
Monday, October 27, 2025 3:07:19 PM document.viewed
Wednesday, November 26, 2025 2:06:53 PM document.voided

---------------



































Old Proposals Sent out previously:

Sent Item # 3326

Date/Time Submitted Sent By PandaDoc Document ID Link Result Grand Total At the Time
Monday, October 27, 2025 2:38:23 PM kaylorwerner@atpslandscaping.com eEKBTpHhH6jfA9ABzdZ8wk (Click to go to pandadoc->) failed $ 0.00
Sent out without a signing link - click on the PandaDoc Document ID Link to add the recipient and send for signing

---------------







Sent Item # 3325

Date/Time Submitted Sent By PandaDoc Document ID Link Result Grand Total At the Time
Monday, October 27, 2025 11:12:25 AM kaylorwerner@atpslandscaping.com q7KUBxcmUMwjcZe8WhhnzF (Click to go to pandadoc->) failed $ 0.00
Sent out without a signing link - click on the PandaDoc Document ID Link to add the recipient and send for signing
Monday, October 27, 2025 11:43:40 AM document.sent
Monday, October 27, 2025 11:48:48 AM document.viewed
Monday, October 27, 2025 3:05:24 PM document.draft
Monday, October 27, 2025 3:05:24 PM document.draft

---------------







Sent Item # 3324

Date/Time Submitted Sent By PandaDoc Document ID Link Result Grand Total At the Time
Monday, October 27, 2025 11:05:44 AM kaylorwerner@atpslandscaping.com System.Net.Http.HttpRequestException: Request failed with status code Conflict at RestSharp.ResponseThrowExtension.ThrowIfError(RestResponse response) at RestSharp.RestClientExtensions.PostAsync(IRestClient client (Click to go to pandadoc->) $ 0.00
Good Afternoon Jeff,

I hope you're doing well. Thank you for the opportunity to assist with the landscaping plans for 1267 Smoky River Dr. I've put together a proposal that outlines the scope of work, recommended design elements, and estimated costs.
Estimated Cost:
You can view the full proposal and design concepts here:

Ekstrand Landscape Proposal

If you have any questions or would like to make adjustments, please don’t hesitate to reach out. I’d be happy to schedule a time to talk through the proposal in more detail.
Thanks again for considering All Terrain as I look forward to working with you!

Best regards,
Derrick Bleeker







Good afternoon Jeff,

Thank you for contacting All Terrain Landscaping.  It was a pleasure meeting with you and discussing the project the other day.
You can review the proposal and quote by opening the link below, and please let me know if you have any questions or need clarification on anything.

Ekstrand Landscape Proposal

If there are any modifications or adjustments needed, or if the cost is outside of budget, just let me know and we can work together to get the project(s) and budget inline.  If you would like to proceed with the project(s) as is, sign the proposal and return to us.  We do require a deposit of 50%.  Our Office Manager will send a payment link once we receive the signed contract.  Once we receive a deposit the office will release this work order for scheduling.   Within a week after that our Project Manager will contact you to discuss scheduling options.

I look forward to hearing back from you!

Best regards,
Mike Garcia


Good Afternoon Jeff,

I hope all is well. Thank you for taking the time to meet with me and show me around.  Attached in the link below is a proposal for the landscape project we discussed. Please feel free to reach out with any questions you may have as I can make any changes needed. I look forward to hearing from you and have a great rest of your day.

Ekstrand Landscape Proposal

Kaylor Werner


---------------










Warning! Hitting the below buttons will lock the bid.

Lock Bid and generate proposal on Pandadoc (You will still have to go to pandadoc and send it manually)


Lock Bid and generate proposal with copy-pasteable link (this is also the one for the new signing platform)








Lock the bid

Unlock the bid - Admin Only




Create Bid Price Lock Item - Admin Only








Bid Details

Bid Copied (Don't count in bid tracking)

If this is checked, the bid will not be counted in Bid Tracking, because there is a new bid that was copied from it.

bid_copied

Bid Description

For maintenance bid only


Number of Months: 0.00
Monthly Payment: 0.00

Production rate modifier. Use this to increase or decrease the production rate for everything on the entire bid.

A number higher than 1.0 will result in less labor hours.

A number from 0.0 - 1.0 will result in MORE labor hours.

HindSite

Wow! Fucking Amazing! This does nothing yet though I wonder why...

send_to_hindsite released_to_hindsite hindsite_released_date hindsite_error hindsite_error_verbose

Design Details






Awarded To

This should all get filled out automatically from the signing platform once they sign, you can change it here if it does not.


Use this dropdown as a convenience to insert someone's e-mail into the above awarded to box.

Use the "Submit Date" until told otherwise.





ProfitSeeker!

Run a script to see what the totals will be for each possible percent, useful if you want to stay within the customer's budget:

ProfitSeeker! (Takes a few minutes, don't leave the page!)




MOB Calculator Step-Through

Use this to debug the cost of the MOB.

Scope: Sport Court Wall

1. Total labor hours for everything outside of MOB items: 17.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (17.00) / Productive_Hours_Per_Day 6.500 = 2.6153846153846153846153846154

4. ROUNDUP(2.6153846153846153846153846154) = 3

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 3 * Travel_Time_Per_Day (0.75) *2 = 4.50 Hours of MOB



Scope: Trampoline Wall

1. Total labor hours for everything outside of MOB items: 10.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (10.00) / Productive_Hours_Per_Day 6.500 = 1.5384615384615384615384615385

4. ROUNDUP(1.5384615384615384615384615385) = 2

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 2 * Travel_Time_Per_Day (0.75) *2 = 3.00 Hours of MOB



Scope: Firepit Wall

1. Total labor hours for everything outside of MOB items: 17.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (17.00) / Productive_Hours_Per_Day 6.500 = 2.6153846153846153846153846154

4. ROUNDUP(2.6153846153846153846153846154) = 3

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 3 * Travel_Time_Per_Day (0.75) *2 = 4.50 Hours of MOB



Scope: Planting Bed

1. Total labor hours for everything outside of MOB items: 24.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (24.00) / Productive_Hours_Per_Day 6.500 = 3.6923076923076923076923076923

4. ROUNDUP(3.6923076923076923076923076923) = 4

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 4 * Travel_Time_Per_Day (0.75) *2 = 6.00 Hours of MOB



Scope: Raised Planters

1. Total labor hours for everything outside of MOB items: 17.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (17.00) / Productive_Hours_Per_Day 6.500 = 2.6153846153846153846153846154

4. ROUNDUP(2.6153846153846153846153846154) = 3

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 3 * Travel_Time_Per_Day (0.75) *2 = 4.50 Hours of MOB



Scope: Sod

1. Total labor hours for everything outside of MOB items: 8.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (8.00) / Productive_Hours_Per_Day 6.500 = 1.2307692307692307692307692308

4. ROUNDUP(1.2307692307692307692307692308) = 2

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 2 * Travel_Time_Per_Day (0.75) *2 = 3.00 Hours of MOB



Scope: Irrigation

1. Total labor hours for everything outside of MOB items: 15.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (15.00) / Productive_Hours_Per_Day 6.500 = 2.3076923076923076923076923077

4. ROUNDUP(2.3076923076923076923076923077) = 3

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 3 * Travel_Time_Per_Day (0.75) *2 = 4.50 Hours of MOB



Scope: Plants and Trees

1. Total labor hours for everything outside of MOB items: 14.05

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (14.05) / Productive_Hours_Per_Day 6.500 = 2.1615384615384615384615384615

4. ROUNDUP(2.1615384615384615384615384615) = 3

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 3 * Travel_Time_Per_Day (0.75) *2 = 4.50 Hours of MOB



Scope: Breeze Patio

1. Total labor hours for everything outside of MOB items: 3.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (3.00) / Productive_Hours_Per_Day 6.500 = 0.4615384615384615384615384615

4. ROUNDUP(0.4615384615384615384615384615) = 1

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 1 * Travel_Time_Per_Day (0.75) *2 = 1.50 Hours of MOB






Salesman Text Blurb

 

Editable PDF Text Blurb


Copy-pastable Original Text Blurb

Note, this area does not auto-reload, if you just added a line-item, please reload the page

If there is a new generated item that is not in the above text, it is highlighted in red.

Click here to dump below text into above box (Remember to hit save, lower right corner)

All irrigation are done on a time and material basis of $95.00 per man hour plus materials.
Sport Court Wall
Installation of Retaining Wall to include:
-Installation of 3.00 tons of road base for base materials
-Installation of 3.00 tons of sand for base materials
-Installation of 368.00 Versalok / Allan block retaining wall blocks
-Installation of 136.00 block caps
-For a 55.00 LF by 2.00 tall retaining wall
- Installation of 148.00 retaining wall blocks
- Installation of 55.00 block caps
- Installation of 1.00 tons of road base for base material
- Installation of 55 tons of 1-1/2" local river rock behind wall for drainage
- Installation of 1.00 tons of sand for base material


Trampoline Wall
Installation of Retaining Wall to include:
-Installation of 3.00 tons of road base for base materials
-Installation of 3.00 tons of sand for base materials
-Installation of 368.00 Versalok / Allan block retaining wall blocks
-Installation of 136.00 block caps
-For a 28.00 LF by 2.00 tall retaining wall
- Installation of 76.00 retaining wall blocks
- Installation of 28.00 block caps
- Installation of 1.00 tons of road base for base material
- Installation of 28 tons of 1-1/2" local river rock behind wall for drainage
- Installation of 1.00 tons of sand for base material


Firepit Wall
Installation of Retaining Wall to include:
-Installation of 3.00 tons of road base for base materials
-Installation of 3.00 tons of sand for base materials
-Installation of 368.00 Versalok / Allan block retaining wall blocks
-Installation of 136.00 block caps
-For a 53.00 LF by 2.00 tall retaining wall
- Installation of 144.00 retaining wall blocks
- Installation of 53.00 block caps
- Installation of 1.00 tons of road base for base material
- Installation of 53 tons of 1-1/2" local river rock behind wall for drainage
- Installation of 1.00 tons of sand for base material


Planting Bed
- Installation of 14.50 tons of 1-1/2" mountain granite river rock
- Installation of 4520 square feet of landscape fabric
- Installation of 11.00 tons of 2"-4" white cobble
- Installation of 22.50 yards of cascade cedar mulch
- Installation of 5.50 tons of 3/8" grey granite chip
- Installation of 4.50 tons of Colorado buff boulders
- Installation of 492 linear feet of metal roll top edging


Raised Planters
Installation of Timber Retaining Wall to include:
-Installation of 1.00 tons of road base for base materials
-Installation of 1.00 tons of sand for base materials
-Installation of 24.00 timbers
-For a 60.00 LF by 1.50 tall retaining wall
- Installation of 24 - 6" by 6" by 8' long timbers
- Installation of 1 tons of road base for base material
- Installation of 1 tons of sand for base material
- Installation of 60 tons of 1-1/2" local river rock behind wall for drainage
- Installation of 3 yards of topsoil for berm
- Installation of 60 square feet of landscape fabric


Sod
- Installation of 1397 SQFT of blue grass sod
- Rototilling
- Installation of final grade
- Installation of 5.00 yards of compost


Irrigation
·PVC mainline ·Schedule 80 manifolds- Rotor style irrigation heads with drip irrigation / no drip included
- Installation of drip irrigation


Plants and Trees
Installation of 9 - 2" caliper trees
- Installation of 2 - 15 gallon trees
- Installation of 9 - 5 gallon shrubs
- Installation of 42 - 1 gallon perennials


Breeze Patio
- Installation of 3.50 tons of 3/8" grey granite chip
- Installation of 224 square feet of landscape fabric


Make a copy of this Bid->

This will copy the bid, with all its scopes and each item from each of those scopes, into a new bid, inside the same customer.