Embedded edit pop-up window for: Area: 2025 Holiday Light Reinstall Parent Item: C9 LED Roofline (Bulbs Included)

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

2025 Holiday Light Reinstall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1 (OLD)
Roofline, C9 LED Roofline (Bulbs Included)
FT 0.00

%
207.30 7.35 602.70
602.70
2 ---
, Takedown
0.00 %
3.15 258.30
258.30
3 (OLD)
, Holiday Lighting Minimum 150 and 8 Hour Labor Reconciliation
0.00 1.00 %
--Disabled--
4 (OLD)
Greenery, 48" LED Wreath
0.00 260.47 %
1517.33 10.50 861.00
861.00
5 ---
, Takedown
0.00 %
4.50 369.00
369.00
7 (OLD)
MOB, MOB
0.00 %
--Disabled--
8
0.00 0.00 2410.00 2025 Holiday Light Reinstall Scope Total:
5392.37
 

This bid Created By: joshquinn@atpslandscaping.com at 10/13/2025 2:53 PM


This bid last edited by: at 12/15/2025 11:58 PM

 
Edit - Landscaping_Software
Grand Total: $ 5392.37