🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Mike Allen Bid #:13222 - holidaylighting

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for: Area: 2025 Holiday Light Reinstall Parent Item: C9 LED Roofline (Bulbs Included)

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

2025 Holiday Light Reinstall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1 (OLD)
Roofline, C9 LED Roofline (Bulbs Included)
FT 0.00

%
119.06 13.65 950.04
950.04
2 ---
, Takedown
0.00 %
5.85 407.16
407.16
3 (OLD)
, Holiday Lighting Minimum 150 and 8 Hour Labor Reconciliation
0.00 1.00 %
133.75
133.75
4
(OLD)
Tree Wrapping, Swagging - Canopy Lights - 36"
FT 0.00 0.96 %
252.08 12.60 877.25
877.25
5 ---
, Installation and Removal - Swagging Canopy Lights
0.00 0.60 %
5.40 405.00
405.00
6
(OLD)
Tree Wrapping, Branch Wrapping
0.00 17.83 %
133.13 8.96 623.62
623.62
7 ---
, Takedown
0.00 %
3.84 267.26
267.26
8 (OLD)
Misc, Miscellaneous, Holiday Lighting


0.00 %
16.25
341.25
379.17
10 (OLD)
MOB, MOB
0.00 %
8.00 556.80
556.80
11
16.25 0.00 475.00 2025 Holiday Light Reinstall Scope Total:
4600.05
 

This bid Created By: joshquinn@atpslandscaping.com at 10/14/2025 6:32 PM


This bid last edited by: at 12/16/2025 2:07 AM

 
Edit - Landscaping_Software
Grand Total: $ 4600.05