🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Katie Orrell Bid #:17265 - holidaylighting

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for:
Area: Katie Orrell
Parent Item: C7 LED Roofline (Bulbs Included)

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

Katie Orrell

Holiday Lighting

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
Roofline, C7 LED Roofline (Bulbs Included)
0.00

%
13.78
289.28 106.99 4.55 316.68 79.17
792.12
2 ---
, Takedown
0.00 %
1.95 135.72 33.93
169.65
3 (OLD)
, Holiday Lighting Minimum 150 and 8 Hour Labor Reconciliation
0.00 1.00 %
131.08
131.08
131.08
4
, Timer
0.00 32.24 %
1.61
33.85 12.52 0.50 34.80 8.70
89.87
5
Misc, Blank Wire
0.00 0.45 %
2.25
47.25 17.48 0.50 34.80 8.70
108.23
6
Misc, Connectors
0.00 1.28 %
1.28
26.88 9.94 0.67 46.40 11.60
94.82
8 (OLD)
MOB, MOB
0.00 %
2.00 139.20 34.80
174.00
9
150.00 0.00 659.42 Katie Orrell Scope Total:
1560.73
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/13/2025 10:41 PM

 
Edit - Landscaping_Software
Grand Total: $ 1560.73