🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Clifton Castle Bid #:10543 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Retaining Wall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Sod
SQFT 200.00 %
20.00
300
520.00 -1045.25 3 675.00 -1356.82
-1207.07
2
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
24.00
150
414.00 -832.18 2 450.00 -904.55
-872.73
3
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0 %
4 --- (OLD)
Wall, Wall Blocks
TONS 0 10.50 %
201.60
150.0
2367.60 -4759.12 13 2925.00 -5879.55
-5346.07
5 --- (OLD)
Cap, Caps
TONS 0 8.50 %
61.20
673.20 -1353.20 9 2025.00 -4070.45
-2725.45
6 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 -303.73
-118.63
7 ---
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
43.20
475.20 -955.20 3 675.00 -1356.82
-1161.82
8 ---
Sand, Sand
TONS 0 43.00 %
0.10
150.0
151.10 -303.73
-110.63
10
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
2.36
25.92 -52.10 1 225.00 -452.27
-253.45
11
PopOut
(OLD)
MOB, MOB
0 %
5 1125.00 -2261.36
-1136.36
12
377.56 900.00 5053.12 Retaining Wall Scope Total:
-13437.261250000000000000
 

Sod

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Sod, Sod
SQFT 0 0.35 %
0.84
250.00
259.24 -521.10 1 225.00 -452.27
-489.13
2 ---
Tilling, Roto-tilling SF
SQFT 0 %
1 225.00 -452.27
-227.27
3 --- (OLD)
Grading, Finish Grading SF
SQFT 0 %
1 225.00 -452.27
-227.27
4 --- (OLD)
Compost, Compost
TON 0 50.00 %
5.00
55.00 -110.56 1 225.00 -452.27
-282.83
5 ---
Sod, Pallet
0 1.00 %
6
PopOut
(OLD)
MOB, MOB
0 %
1 225.00 -452.27
-227.27
7
5.84 250.00 314.24 Sod Scope Total:
-1453.7700000000000000
 

Planting Bed

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 300.00 %
30.00
450
780.00 -1567.88 3 675.00 -1356.82
-1469.70
2
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
33.00
150
513.00 -1031.18 2 450.00 -904.55
-972.73
3
PopOut
(OLD)
Miscellaneous, Miscellaneous


0 %
40.00
440.00 -884.44
-444.44
4
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
3.26
35.89 -72.14 1 225.00 -452.27
-263.52
5
PopOut
(OLD)
MOB, MOB
0 %
1 225.00 -452.27
-227.27
6
106.26 600.00 1768.89 Planting Bed Scope Total:
-3377.662500000000000000
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 2:35 PM

 
Edit - Landscaping_Software
Grand Total: $ -18268.693750000000000000