Customer: Aubreena Deforest Bid #:11843 - install |
Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details
|
Backyard |
Discount: 0.00 % | Customer can decline on the proposal: False |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
Demo, Demo Rock
|
SQFT | 400.00 | % |
40.00
|
600.00
|
1040.00 | 310.65 | 4.00 | 900.00 | 268.83 |
2519.48
|
|||||||||||||||||
| 2 |
|
|
|
(Inches) |
1-1/2" Rock, 1-1/2" Local River Rock
|
Ton | 0.00 | 60.00 | % |
66.00
|
150.00
|
876.00 | 261.66 | 4.00 | 900.00 | 268.83 |
2306.49
|
|||||||||||||
| 3 |
|
|
|
(Feet) |
Wall, Timber Retaining Wall
|
0.00 | % |
|
|
|
||||||||||||||||||||
| 4 | --- |
Timbers, Timbers (ea.)
|
0.00 | 55.00 | % |
0.40
|
150.00
|
154.40 | 46.12 | 2.67 | 600.75 | 179.44 |
1196.71
|
|||||||||||||||||
| 5 | --- |
Roadbase, Road Base
|
0.00 | 35.00 | % |
0.10
|
150.00
|
151.10 | 45.13 |
230.23
|
||||||||||||||||||||
| 6 | --- |
Sand, Sand
|
0.00 | 43.00 | % |
0.10
|
150.00
|
151.10 | 45.13 |
238.23
|
||||||||||||||||||||
| 7 | --- |
1-1/2" Rock, 1.5" Rock
|
0.00 | 60.00 | % |
72.00
|
|
792.00 | 236.57 |
1028.57
|
||||||||||||||||||||
| 8 |
|
Edging, Edging
|
FT | 0.00 | % |
|
|
2.00 | 450.00 | 134.42 |
584.42
|
|||||||||||||||||||
| 9 | --- |
Edging, sticks
|
0.00 | 16.00 | % |
22.40
|
|
246.40 | 73.60 |
320.00
|
||||||||||||||||||||
| 10 |
|
|
|
(Feet) |
Wall, Timber Retaining Wall
|
0.00 | % |
|
|
|
||||||||||||||||||||
| 11 | --- |
Timbers, Timbers (ea.)
|
0.00 | 55.00 | % |
2.10
|
150.00
|
173.10 | 51.71 | 14.00 | 3150.00 | 940.91 |
5449.72
|
|||||||||||||||||
| 12 | --- |
Roadbase, Road Base
|
0.00 | 35.00 | % |
0.10
|
150.00
|
151.10 | 45.13 |
230.23
|
||||||||||||||||||||
| 13 | --- |
Sand, Sand
|
0.00 | 43.00 | % |
0.10
|
150.00
|
151.10 | 45.13 |
238.23
|
||||||||||||||||||||
| 14 | --- |
1-1/2" Rock, 1.5" Rock
|
0.00 | 60.00 | % |
300.00
|
|
3300.00 | 985.71 |
4285.71
|
||||||||||||||||||||
| 15 |
|
|
|
(Inches) |
3/8" Pea Gravel, 3/8" pea gravel
|
TONS | 0.00 | 60.00 | % |
18.00
|
|
198.00 | 59.14 | 1.00 | 225.00 | 67.21 |
549.35
|
|||||||||||||
| 16 |
|
|
|
(Inches) |
Topsoil, Top Soil
|
TONS | 0.00 | 50.00 | % |
20.00
|
150.00
|
370.00 | 110.52 | 1.00 | 225.00 | 67.21 |
772.73
|
|||||||||||||
| 17 |
|
(OLD)
Fabric, Fabric
|
SQFT | 0.00 | 87.00 | % |
8.64
|
|
95.06 | 28.40 | 1.00 | 225.00 | 67.21 |
415.67
|
||||||||||||||||
| 18 |
|
(OLD)
MOB, MOB
|
0.00 | % |
|
|
10.00 | 2250.00 | 672.08 |
2922.08
|
||||||||||||||||||||
| 549.94 | 1800.00 | 7849.36 | Backyard | Scope Total: | 23287.85 |
Frontyard |
Discount: 0.00 % | Customer can decline on the proposal: False |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
Demo, Demo Rock
|
SQFT | 500.00 | % |
50.00
|
750.00
|
1300.00 | 388.31 | 5.00 | 1125.00 | 336.04 |
3149.35
|
|||||||||||||||||
| 2 |
|
|
|
(Inches) |
1-1/2" Rock, 1-1/2" Local River Rock
|
Ton | 0.00 | 60.00 | % |
24.00
|
150.00
|
414.00 | 123.66 | 2.00 | 450.00 | 134.42 |
1122.08
|
|||||||||||||
| 3 |
|
|
|
(Inches) |
Mulch, Cascade Cedar Mulch
|
Yard | 0.00 | 69.50 | % |
17.38
|
150.00
|
341.13 | 101.89 | 1.00 | 225.00 | 67.21 |
735.23
|
|||||||||||||
| 4 |
|
Edging, Edging
|
FT | 0.00 | % |
|
|
2.00 | 450.00 | 134.42 |
584.42
|
|||||||||||||||||||
| 5 | --- |
Edging, sticks
|
0.00 | 16.00 | % |
35.20
|
|
387.20 | 115.66 |
502.86
|
||||||||||||||||||||
| 6 |
|
Flagstone, Flagstone Patio & Sidewalk SQFT
|
0.00 | % |
|
|
4.00 | 900.00 | 268.83 |
1168.83
|
||||||||||||||||||||
| 7 | --- |
Flagstone, Flagstone
|
0.00 | % |
30.74
|
150.00
|
488.18 | 145.82 |
634.00
|
|||||||||||||||||||||
| 8 | --- |
Patio, Poli-Sand Flagstone
|
0.00 | 60.00 | % |
18.00
|
|
198.00 | 59.14 |
257.14
|
||||||||||||||||||||
| 9 | --- |
Sand, Sand
|
0.00 | 43.00 | % |
4.30
|
150.00
|
197.30 | 58.93 |
256.23
|
||||||||||||||||||||
| 10 | --- |
Road Base, Road Base - Flagstone
|
0.00 | 35.00 | % |
7.00
|
150.00
|
227.00 | 67.81 |
294.81
|
||||||||||||||||||||
| 11 |
|
(OLD)
Fabric, Fabric
|
SQFT | 0.00 | 87.00 | % |
4.02
|
|
44.26 | 13.22 | 1.00 | 225.00 | 67.21 |
349.69
|
||||||||||||||||
| 12 |
|
(OLD)
MOB, MOB
|
0.00 | % |
|
|
6.00 | 1350.00 | 403.25 |
1753.25
|
||||||||||||||||||||
| 190.64 | 1500.00 | 3597.07 | Frontyard | Scope Total: | 10807.89 |
This bid Created By: at 10/1/2025 2:23 PM
This bid last edited by: at 12/15/2025 2:59 AM