🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Aubreena Deforest Bid #:11843 - install

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for: Area: Frontyard Parent Item: Demo Rock

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

Frontyard

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
Demo, Demo Rock
SQFT 500.00 %
50.00
750.00
1300.00 388.31 5.00 1125.00 336.04
3149.35
2

(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
24.00
150.00
414.00 123.66 2.00 450.00 134.42
1122.08
3

(Inches)
Mulch, Cascade Cedar Mulch
Yard 0.00 69.50 %
17.38
150.00
341.13 101.89 1.00 225.00 67.21
735.23
4
Edging, Edging
FT 0.00 %
2.00 450.00 134.42
584.42
5 ---
Edging, sticks
0.00 16.00 %
35.20
387.20 115.66
502.86
6
Flagstone, Flagstone Patio & Sidewalk SQFT
0.00 %
4.00 900.00 268.83
1168.83
7 ---
Flagstone, Flagstone
0.00 %
30.74
150.00
488.18 145.82
634.00
8 ---
Patio, Poli-Sand Flagstone
0.00 60.00 %
18.00
198.00 59.14
257.14
9 ---
Sand, Sand
0.00 43.00 %
4.30
150.00
197.30 58.93
256.23
11 (OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
4.02
44.26 13.22 1.00 225.00 67.21
349.69
12 (OLD)
MOB, MOB
0.00 %
6.00 1350.00 403.25
1753.25
13
190.64 1500.00 3597.07 Frontyard Scope Total:
10807.89
 

This bid Created By: at 10/1/2025 2:23 PM


This bid last edited by: at 12/15/2025 7:29 PM

 
Edit - Landscaping_Software
Grand Total: $ 10807.89