🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Jim Falk Bid #:1209 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Pathway

Concrete

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Concrete, Concrete,Grey Broom
0.00 13.00 %
421.20
4633.20 1383.94 7.00 203.86
6903.50
2
PopOut
Miscellaneous, Miscellaneous


0.00 %
25.00
275.00 82.14 900.00 268.83
1525.97
3
PopOut
Miscellaneous, Miscellaneous


0.00 %
15.00
165.00 49.29
214.29
4
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Glacier Blue River Rock
Ton 0.00 75.65 %
26.48
150.00
441.26 131.80 2.00 450.00 134.42
1157.47
6
PopOut
MOB, MOB
0.00 %
4.00 900.00 268.83
1168.83
7
489.86 150.00 5538.39 Pathway Scope Total:
11293.35
 

Sidewalk

Pavers

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Pavers, Paver Sidewalk SQFT
0.00 %
2 ---
Pavers, Pavers
0.00 7.00 %
226.80
150.00
2644.80 790.01 33.00 7425.00 2217.86
13077.67
3 ---
Poli Sand, Poli-sand
0.00 60.00 %
30.00
150.00
480.00 143.38
623.38
4 ---
Sand, Sand
0.00 43.00 %
8.60
150.00
244.60 73.06
317.66
5 ---
Roadbase, Road base
0.00 35.00 %
45.50
150.00
650.50 194.31
844.81
6
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0.00 %
7 ---
Wall, Wall Blocks
TONS 0.00 10.50 %
63.00
150.00
843.00 251.81 11.00 2475.00 739.29
4309.10
8 ---
Cap, Caps
TONS 0.00 8.50 %
76.50
841.50 251.36 11.00 2475.00 739.29
4307.15
9 ---
Roadbase, Road base
TONS 0.00 35.00 %
0.10
150.00
151.10 45.13
230.23
10 ---
1-1/2" Rock, 1-1/2" Local River Rock
0.00 60.00 %
11
PopOut
Miscellaneous, Miscellaneous


0.00 %
25.00
275.00 82.14 675.00 201.62
1233.76
12
PopOut
Miscellaneous, Miscellaneous


0.00 %
15.00
165.00 49.29 225.00 67.21
506.50
13
PopOut
MOB, MOB
0.00 %
20.00 4500.00 1344.16
5844.16
14
490.50 900.00 6295.50 Sidewalk Scope Total:
31294.42
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 9:50 AM

 
Edit - Landscaping_Software
Grand Total: $ 42587.77