🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Aubreena Deforest Bid #:12377 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Retaining Wall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Feet)
Wall, Timber Retaining Wall
0.00 %
2 ---
Timbers, Timbers (ea.)
0.00 55.00 %
0.40
150.00
154.40 46.12 2.67 600.75 179.44
1196.71
3 ---
Roadbase, Road Base
0.00 35.00 %
0.10
150.00
151.10 45.13
230.23
4 ---
Sand, Sand
0.00 43.00 %
0.10
150.00
151.10 45.13
238.23
5 ---
1-1/2" Rock, 1.5" Rock
0.00 60.00 %
72.00
72.00
--Disabled--
6
PopOut


(Inches)
Topsoil, Top Soil
TONS 0.00 50.00 %
8
PopOut
(OLD)
MOB, MOB
0.00 %
1.00 225.00 67.21
292.21
9
72.60 450.00 528.60 Retaining Wall Scope Total:
1957.38
 

Raised Planter Beds

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Feet)
Wall, Timber Retaining Wall
0.00 %
2 ---
Timbers, Timbers (ea.)
0.00 55.00 %
2.10
150.00
173.10 51.71 14.00 3150.00 940.91
5449.72
3 ---
Roadbase, Road Base
0.00 35.00 %
0.10
150.00
151.10 45.13
230.23
4 ---
Sand, Sand
0.00 43.00 %
0.10
150.00
151.10 45.13
238.23
5 ---
1-1/2" Rock, 1.5" Rock
0.00 60.00 %
300.00
300.00
--Disabled--
6
PopOut


(Inches)
Topsoil, Top Soil
TONS 0.00 50.00 %
20.00
150.00
370.00 110.52 1.00 225.00 67.21
772.73
7
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
8
PopOut
(OLD)
MOB, MOB
0.00 %
3.00 675.00 201.62
876.62
9
322.30 600.00 1145.30 Raised Planter Beds Scope Total:
7567.53
 

Dog Run

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 100.00 %
10.00
150.00
260.00 77.66 1.00 225.00 67.21
629.87
2
PopOut


(Inches)
3/8" Pea Gravel, 3/8" pea gravel
TONS 0.00 60.00 %
18.00
198.00 59.14 1.00 225.00 67.21
549.35
3
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
1.89
20.74 6.19 1.00 225.00 67.21
319.14
4
PopOut
(OLD)
MOB, MOB
0.00 %
1.00 225.00 67.21
292.21
5
29.89 150.00 478.74 Dog Run Scope Total:
1790.57
 

Backyard Planting Bed

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 400.00 %
40.00
600.00
1040.00 310.65 4.00 900.00 268.83
2519.48
2
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
66.00
150.00
876.00 261.66 4.00 900.00 268.83
2306.49
3
PopOut
Edging, Edging
FT 0.00 %
2.00 450.00 134.42
584.42
4 ---
Edging, sticks
0.00 16.00 %
22.40
246.40 73.60
320.00
5
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
6.76
74.33 22.20 1.00 225.00 67.21
388.74
6
PopOut
(OLD)
MOB, MOB
0.00 %
2.00 450.00 134.42
584.42
7
135.16 750.00 2236.73 Backyard Planting Bed Scope Total:
6703.55
 

Flagstone Path

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Flagstone, Flagstone Patio & Sidewalk SQFT
0.00 %
8.00 1800.00 537.66
2337.66
2 ---
Flagstone, Flagstone
0.00 %
73.69
300.00
1110.57 331.73
1442.30
3 ---
Patio, Poli-Sand Flagstone
0.00 60.00 %
36.00
396.00 118.29
514.29
4 ---
Sand, Sand
0.00 43.00 %
4.30
150.00
197.30 58.93
256.23
5 ---
Road Base, Road Base - Flagstone
0.00 35.00 %
10.50
150.00
265.50 79.31
344.81
6
PopOut
(OLD)
MOB, MOB
0.00 %
2.00 450.00 134.42
584.42
7
124.49 600.00 1969.37 Flagstone Path Scope Total:
5479.71
 

Front yard

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 500.00 %
50.00
750.00
1300.00 388.31 5.00 1125.00 336.04
3149.35
2
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
24.00
150.00
414.00 123.66 2.00 450.00 134.42
1122.08
3
PopOut


(Inches)
Mulch, Cascade Cedar Mulch
Yard 0.00 69.50 %
17.38
150.00
341.13 101.89 1.00 225.00 67.21
735.23
4
PopOut
Edging, Edging
FT 0.00 %
2.00 450.00 134.42
584.42
5 ---
Edging, sticks
0.00 16.00 %
35.20
387.20 115.66
502.86
6
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
4.02
44.26 13.22 1.00 225.00 67.21
349.69
7
PopOut
(OLD)
MOB, MOB
0.00 %
2.00 450.00 134.42
584.42
8
130.60 1050.00 2486.59 Front yard Scope Total:
7028.05
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 6:22 PM

 
Edit - Landscaping_Software
Grand Total: $ 30526.79