🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Sean Lichter Bid #:12621 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Back Yard

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 100.00 %
10.00
150
260.00 77.66 1 225.00 67.21
629.87
2
PopOut
(OLD)
Miscellaneous, Miscellaneous


0 %
450.00 134.42
584.42
3
PopOut
Flagstone, Flagstone Patio & Sidewalk SQFT
0 %
16 3600.00 1075.32
4675.32
4 ---
Flagstone, Flagstone
0 %
78.08
300
1158.88 346.16
1505.04
5 ---
Patio, Poli-Sand Flagstone
0 60.00 %
36.00
396.00 118.29
514.29
6 ---
Sand, Sand
0 43.00 %
4.30
150
197.30 58.93
256.23
7 ---
Road Base, Road Base - Flagstone
0 35.00 %
10.50
150
265.50 79.31
344.81
8
PopOut


(Inches)
Breeze, Grey Breeze
Ton 0.00 39.00 %
5.85
150
214.35 64.03 1 225.00 67.21
570.59
9
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0 %
10 --- (OLD)
Wall, Wall Blocks
TONS 0 10.50 %
11.55
150.0
277.05 82.76 2 450.00 134.42
944.23
11 --- (OLD)
Cap, Caps
TONS 0 8.50 %
13.60
149.60 44.69 2 450.00 134.42
778.71
12 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 45.13
230.23
13 ---
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
150.00
150.00
--Disabled--
14 ---
Sand, Sand
TONS 0 43.00 %
0.10
150.0
151.10 45.13
238.23
15
PopOut
Edging, Edging
FT 0 %
1 225.00 67.21
292.21
16 ---
Edging, sticks
0 16.00 %
14.40
158.40 47.31
205.71
17
PopOut
1 Gallon, Perennial 1 gal
0 18.00 %
21.60
237.60 70.97 0.96 216.00 64.52
589.09
18
PopOut
Plants, Tree/Plant Delivery Cost
0 %
275.0
275.00 82.14
357.14
19
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
0.87
9.57 2.86 1 225.00 67.21
304.64
20
PopOut
(OLD)
MOB, MOB
0 %
10 2250.00 672.08
2922.08
21
206.95 1775.00 4051.45 Back Yard Scope Total:
15942.840000000000000000
 

Front

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Irrigation Zones, # of zones
ZONE 0 322.00 %
32.20
354.20 105.80 8.12 1828.12 546.06
2834.18
2
PopOut
Taps, Taps
ZONE 0 1500.00 %
150.00
1650.00 492.86
2142.86
3
PopOut
Backflow, Backflow
ZONE 0 150.00 %
15.00
165.00 49.29
214.29
4
PopOut
Controller, Clock
ZONE 0 150.00 %
15.00
165.00 49.29
214.29
5
PopOut
Demo, Demo Rock
SQFT 100.00 %
10.00
150
260.00 77.66 1 225.00 67.21
629.87
6
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Grand Mesa River Rock
Ton 150.00 94.10 %
24.41
150
418.51 125.01 1 225.00 67.21
835.73
7
PopOut
1 Gallon, Perennial 1 gal
0 18.00 %
9.00
99.00 29.57 0.40 90.00 26.88
245.45
8
PopOut
Plants, Tree/Plant Delivery Cost
0 %
275.0
275.00 82.14
357.14
9
PopOut
Pavers, Paver Sidewalk SQFT
0 %
10 ---
Pavers, Pavers
0.00 7.00 %
38.50
150
573.50 171.31 7 1575.00 470.45
2790.26
11 ---
Poli Sand, Poli-sand
0.00 60.00 %
6.00
66.00 19.71
85.71
12 ---
Sand, Sand
0 43.00 %
4.30
150
197.30 58.93
256.23
13 ---
Roadbase, Road base
0 35.00 %
10.50
150
265.50 79.31
344.81
15
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
0.54
5.98 1.79 1 225.00 67.21
299.98
16
PopOut
(OLD)
MOB, MOB
0 %
8 1800.00 537.66
2337.66
17
315.45 1025.00 4494.99 Front Scope Total:
12513.146250000000000000
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 11:53 PM

 
Edit - Landscaping_Software
Grand Total: $ 28455.986250000000000000