Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Demo, Demo Sod
SQFT 600.00 %
60.00
900.00
1560.00 465.97 12.00 2700.00 806.49
5532.46
3
PopOut
(OLD)
MOB, MOB
0.00 %
3.00 675.00 201.62
876.62
4
140.00 2100.00 3640.00 Demo Scope Total:
11448.04
 

Plants

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
2" Tree, Tree 2"
0.00 345.00 %
69.00
759.00 226.71 1.50 337.50 100.81
1424.02
2
PopOut
Plants, Tree/Plant Delivery Cost
0.00 %
275.00
275.00 82.14
357.14
3
PopOut
(OLD)
5 Gallon Shrub, Shrub 5 gal
0.00 35.00 %
185.50
2040.50 609.50 8.48 1908.00 569.92
5127.92
4
PopOut
(OLD)
5 Gallon Evergreen, Evergreen shrub, 5 gal
0.00 60.00 %
24.00
264.00 78.86 2.00 450.00 134.42
927.28
5
PopOut
(OLD)
1 Gallon, Perennial 1 gal
0.00 12.00 %
118.80
1306.80 390.34 7.92 1782.00 532.29
4011.43
6
PopOut
(OLD)
MOB, MOB
0.00 %
3.00 675.00 201.62
876.62
7
397.30 275.00 4645.30 Plants Scope Total:
12724.41
 

Planting Bed

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Inches) (OLD)
1-1/2" Rock, 1-1/2" Black Granite
Ton 300.00 74.00 %
248.30
300.00
3031.30 905.45 10.00 2250.00 672.08
6858.83
2
PopOut


(Inches)
Mulch, Western Red Cedar Mulch
Yard 0.00 71.30 %
6766.37
2850.00
77280.07 23083.66 2.00 450.00 134.42
100948.15
3
PopOut
(OLD)
Boulders, Colorado Buff Boulders
Ton 0.00 245.65 %
368.48
150.00
4203.23 1255.51 15.00 3375.00 1008.12
9841.86
4
PopOut
Boulder, Boulder Delivery Cost
0.00 %
150.00
150.00 44.81
194.81
5
PopOut


(Inches)
Breeze, Mountain Granite Breeze
Ton 0.00 33.00 %
6006.00
5550.00
71616.00 21391.79 607.00 136575.00 40795.13
270377.92
6
PopOut
(OLD)
Edging, Edging
FT 0.00 %
12.00 2700.00 806.49
3506.49
7 --- (OLD)
Edging, sticks
0.00 16.00 %
246.40
2710.40 809.60
3520.00
8
PopOut


(Inches) (OLD)
Topsoil, Top Soil
TONS 0.00 50.00 %
65.00
150.00
865.00 258.38 4.00 900.00 268.83
2292.21
9
PopOut
Miscellaneous, Miscellaneous


0.00 %
150.00 44.81 450.00 134.42
779.23
10
PopOut
(OLD)
Downspouts, Downspouts
0.00 75.00 %
37.50
412.50 123.21 10.00 2250.00 672.08
3457.79
11
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
38.59
424.51 126.80 4.00 900.00 268.83
1720.14
12
PopOut
(OLD)
MOB, MOB
0.00 %
96.00 21600.00 6451.95
28051.95
13
13776.64 9300.00 160843.01 Planting Bed Scope Total:
431549.38
 

Sod

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Sod, Sod
SQFT 0.00 0.35 %
66.36
250.00
979.96 292.72 4.00 900.00 268.83
2441.51
2 --- (OLD)
Tilling, Roto-tilling SF
SQFT 0.00 %
1.00 225.00 67.21
292.21
3 --- (OLD)
Grading, Finish Grading SF
SQFT 0.00 %
2.00 450.00 134.42
584.42
4 --- (OLD)
Compost, Compost
TON 0.00 50.00 %
30.00
330.00 98.57 2.00 450.00 134.42
1012.99
5 ---
Sod, Pallet
0.00 1.00 %
15.00
165.00 49.29
214.29
6
PopOut
(OLD)
MOB, MOB
0.00 %
2.00 450.00 134.42
584.42
7
111.36 250.00 1474.96 Sod Scope Total:
5129.84
 

Irrigation

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Irrigation Zones, # of zones
ZONE 0.00 322.00 %
225.40
2479.40 740.60 43.75 9843.75 2940.34
16004.09
2
PopOut
(OLD)
MOB, MOB
0.00 %
7.00 1575.00 470.45
2045.45
3
225.40 0.00 2479.40 Irrigation Scope Total:
18049.54
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 11:25 AM

 
Edit - Landscaping_Software