🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Rick Guerrero Bid #:12885 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Outdoor Lighting

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Lights, Path
0.00 277.00 %
221.60
2437.60 609.40 3.00 705.00 210.58
3962.58
2
PopOut
Lights, Spot
0.00 151.00 %
30.20
332.20 83.05 1.00 235.00 70.19
720.44
3
PopOut
(OLD)
Lights, Wire
0.00 2.00 %
24.00
24.00
--Disabled--
4
PopOut
Lights, Transformer
0.00 209.00 %
20.90
229.90 57.48 1.00 235.00 70.19
592.57
5
PopOut
(OLD)
Miscellaneous, Miscellaneous


0.00 %
24.00
264.00 66.00 470.00 140.39
940.39
6
PopOut
(OLD)
MOB, MOB
0.00 %
4.00 940.00 280.78
1220.78
7
320.70 0.00 3287.70 Outdoor Lighting Scope Total:
7436.76
 

Planting Beds

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Steppers, 2' by 2' Steppers
0.00 35.00 %
315.00
1890.00 472.50 9.00 2115.00 631.75
5109.25
2
PopOut
Boulders, Aspen Boulders
Ton 0.00 170.00 %
136.00
150.00
1646.00 411.50 8.00 1880.00 561.56
4499.06
3
PopOut
Boulder, Boulder Delivery Cost
0.00 %
150.00
150.00 37.50
187.50
4
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Grey River Rock
Ton 150.00 57.00 %
20.70
150.00
377.70 94.42 1.00 235.00 70.19
777.31
5
PopOut
5 Gallon Shrub, Shrub 5 gal
0.00 45.00 %
18.00
198.00 49.50 0.64 150.40 44.92
442.82
6
PopOut
Plants, Tree/Plant Delivery Cost
0.00 %
275.00
275.00 68.75
343.75
7
PopOut


(Inches)
Topsoil, Top Soil
TONS 0.00 50.00 %
35.00
150.00
535.00 133.75 2.00 470.00 140.39
1279.14
8
PopOut
(OLD)
Sod, Sod
SQFT 0.00 0.35 %
3.50
250.00
288.50 72.12 1.00 235.00 70.19
665.81
9 ---
Tilling, Roto-tilling SF
SQFT 0.00 %
--Disabled--
10 --- (OLD)
Grading, Finish Grading SF
SQFT 0.00 %
--Disabled--
11 ---
Compost, Compost
TON 0.00 50.00 %
5.00
5.00
--Disabled--
13
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
0.54
5.98 1.50 1.00 235.00 70.19
312.67
14
PopOut
(OLD)
MOB, MOB
0.00 %
8.00 1880.00 561.56
2441.56
15
533.74 1125.00 5371.18 Planting Beds Scope Total:
16058.87
 

Pavers

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0.00 %
2 --- (OLD)
Wall, Wall Blocks
TONS 0.00 10.50 %
15.75
150.00
323.25 80.81 3.00 705.00 210.58
1319.64
3 --- (OLD)
Cap, Caps
TONS 0.00 8.50 %
18.70
205.70 51.42 3.00 705.00 210.58
1172.70
4 ---
Roadbase, Road base
TONS 0.00 35.00 %
0.10
150.00
151.10 37.78
222.88
5 ---
1-1/2" Rock, 1-1/2" Local River Rock
0.00 60.00 %
--Disabled--
6 ---
Sand, Sand
TONS 0.00 43.00 %
0.10
150.00
151.10 37.78
230.88
7
PopOut
Pavers, Paver Patio SQFT
0.00 %
8 ---
Pavers, Pavers
0.00 8.00 %
233.60
150.00
2719.60 679.90 37.00 8695.00 2597.21
14691.71
9 ---
Poli Sand, Poli-sand
0.00 60.00 %
24.00
264.00 66.00
330.00
10 ---
Sand, Sand
0.00 43.00 %
8.60
150.00
244.60 61.15
305.75
11 ---
Roadbase, Road base
0.00 35.00 %
38.50
150.00
573.50 143.38
716.88
12
PopOut
(OLD)
MOB, MOB
0.00 %
16.00 3760.00 1123.12
4883.12
13
339.35 900.00 4632.85 Pavers Scope Total:
23873.56
 

Demo

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 200.00 %
20.00
300.00
520.00 130.00 2.00 470.00 140.39
1260.39
2
PopOut
(OLD)
MOB, MOB
0.00 %
2.00 470.00 140.39
610.39
3
20.00 300.00 520.00 Demo Scope Total:
1870.78
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/15/2025 5:22 AM

 
Edit - Landscaping_Software
Grand Total: $ 49239.97