🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Debra Hopkins Bid #:1367 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Hopkins Front Yard Renovation

New concrete in place of flagstone by front porch. Bed demo in front, grind or remove stumps, add 5-6 shrubs in bed adjacent to road, install rock mulch front and east side of house

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Demo, Demo Sod
SQFT 100.00 %
10.00
150.00
260.00 77.66 1.00 225.00 67.21
629.87
2
PopOut
(OLD)
Edging, Edging
FT 0.00 %
1.00 225.00 67.21
292.21
3 ---
Edging, sticks
0.00 16.00 %
19.20
211.20 63.09
274.29
4
PopOut


(Inches) (OLD)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
27.00
150.00
447.00 133.52 1.00 225.00 67.21
872.73
5
PopOut
(OLD)
5 Gallon Shrub, Shrub 5 gal
0.00 35.00 %
21.00
231.00 69.00 1.20 270.00 80.65
650.65
6
PopOut
Plants, Tree/Plant Delivery Cost
0.00 %
275.00
275.00 82.14
357.14
7
PopOut
(OLD)
Miscellaneous, Miscellaneous


0.00 %
250.00 74.68 1125.00 336.04
1785.72
8
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
2.68
29.43 8.79 1.00 225.00 67.21
330.43
9
PopOut
(OLD)
MOB, MOB
0.00 %
4.00 900.00 268.83
1168.83
10
79.88 825.00 1703.63 Hopkins Front Yard Renovation Scope Total:
6361.87
 

Hopkins Front Yard Renovation

New concrete in place of flagstone by front porch. Bed demo in front, grind or remove stumps, add 5-6 shrubs in bed adjacent to road, install wood mulch front and east side of house

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Concrete, Concrete,Grey Broom
0.00 13.00 %
62.40
686.40 205.03 1.00 29.12
1018.05
3
81.60 0.00 897.60 Hopkins Front Yard Renovation Scope Total:
1418.96
 

Hopkins Front Yard Renovation

Need help making the front yard maintenance minimal and look ok. Fix front stoop.

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
0 0 0 Hopkins Front Yard Renovation Scope Total:
0
 
 

This bid Created By: at 7/16/2025 12:12 PM


This bid last edited by: at 12/14/2025 8:33 AM

 
Edit - Landscaping_Software
Grand Total: $ 7780.83