🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Debra Hopkins Bid #:1367 - install

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for: Area: Hopkins Front Yard Renovation Parent Item: Demo Sod

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

Hopkins Front Yard Renovation

New concrete in place of flagstone by front porch. Bed demo in front, grind or remove stumps, add 5-6 shrubs in bed adjacent to road, install rock mulch front and east side of house

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1 (OLD)
Demo, Demo Sod
SQFT 100.00 %
10.00
150
260.00 77.66 1 225.00 67.21
629.87
2 (OLD)
Edging, Edging
FT 0 %
1 225.00 67.21
292.21
3 ---
Edging, sticks
0 16.00 %
19.20
211.20 63.09
274.29
4

(Inches) (OLD)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
27.00
150
447.00 133.52 1 225.00 67.21
872.73
5 (OLD)
5 Gallon Shrub, Shrub 5 gal
0 35.00 %
21.00
231.00 69.00 1.20 270.00 80.65
650.65
6
Plants, Tree/Plant Delivery Cost
0 %
275.0
275.00 82.14
357.14
8 (OLD)
Fabric, Fabric
SQFT 0 87.00 %
2.68
29.43 8.79 1 225.00 67.21
330.43
9 (OLD)
MOB, MOB
0 %
4 900.00 268.83
1168.83
10
79.88 825.00 1703.63 Hopkins Front Yard Renovation Scope Total:
6361.8677500000000000
 

This bid Created By: at 7/16/2025 12:12 PM


This bid last edited by: at 12/15/2025 11:29 PM

 
Edit - Landscaping_Software
Grand Total: $ 6361.8677500000000000