🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Jeff Ekstrand Bid #:13831 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Planting Bed

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Mountain Granite
Ton 150.00 70.50 %
110.18
150.00
1361.93 151.32 3.00 675.00 201.62
2389.87
2
PopOut


(Inches)
2"-4" Rock, 2"-4" White Cobble
Ton 150.00 105.80 %
62.61
150.00
838.71 93.19 2.00 450.00 134.42
1516.32
3
PopOut
Edging, Edging
FT 0.00 %
2.00 450.00 134.42
584.42
4 ---
Edging, sticks
0.00 16.00 %
25.60
281.60 31.29
312.89
5
PopOut


Flagstone, Cowboy Flagstone
Ton 0.00 575.00 %
28.75
150.00
466.25 51.81 1.00 225.00 67.21
810.27
6
PopOut
Demo, Demo Sod
SQFT 100.00 %
10.00
150.00
260.00 28.89 1.00 225.00 67.21
581.10
7
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
10.37
114.12 12.68 1.00 225.00 67.21
419.01
8
PopOut
(OLD)
MOB, MOB
0.00 %
3.00 675.00 201.62
876.62
9
247.51 600.00 3322.61 Planting Bed Scope Total:
7490.50
 

Turf

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


Artificial Turf, Artificial Turf
SQFT 0.00 5.00 %
285.00
3135.00 348.33
3483.33
2 ---
Breeze, Tan Breeze
0.00 60.00 %
57.00
150.00
777.00 86.33
863.33
3 ---
Artificial Turf Install, Turf Install SF
0.00 %
300.00
300.00 33.33 13.00 2925.00 873.70
4132.03
4
PopOut
Edging, Edging
FT 0.00 %
2.00 450.00 134.42
584.42
5 ---
Edging, sticks
0.00 16.00 %
25.60
281.60 31.29
312.89
7
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
8
PopOut
(OLD)
MOB, MOB
0.00 %
4.50 1012.50 302.44
1314.94
9
377.60 600.00 4753.60 Turf Scope Total:
11272.04
 

Concrete

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Concrete, Concrete,Colored stamped
0.00 22.50 %
1518.75
16706.25 2948.16 20.00 344.12
21948.53
2
PopOut
(OLD)
Concrete, Concrete,Boom Pump
0.00 600.00 %
60.00
660.00 116.47 1.00 17.21
891.18
3
PopOut
(OLD)
Concrete, Concrete,Stairs
0.00 50.00 %
40.00
440.00 77.65 1.00 17.21
632.36
4
1618.75 0.00 17806.25 Concrete Scope Total:
23472.07
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 8:59 PM

 
Edit - Landscaping_Software
Grand Total: $ 42234.61