🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Tammy Fancher Bid #:13832 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

plants

Plants

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
2" Tree, Tree 2"
0 425.00 %
42.50
42.50
--Disabled--
2
PopOut
Plants, Tree/Plant Delivery Cost
0 %
275.0
275.00
--Disabled--
3
PopOut
15 Gallon Tree, Tree 15 gal
0 200.00 %
20.00
20.00
--Disabled--
4
PopOut
5 Gallon Shrub, Shrub 5 gal
0 45.00 %
49.50
49.50
--Disabled--
5
PopOut
1 Gallon, Perennial 1 gal
0 18.00 %
37.80
37.80
--Disabled--
6
PopOut
(OLD)
MOB, MOB
0 %
--Disabled--
7
149.80 275.00 424.80 plants Scope Total:
0
 

wall

wall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Miscellaneous, Miscellaneous


0 %
330.00
3630.00 403.33 7256.25 2167.45
13457.03
2
PopOut
Roadbase, Road base
TONS 0 35.00 %
--Disabled--
3
PopOut
(OLD)
MOB, MOB
0 %
7.5 1687.50 504.06
2191.56
4
330.00 0.00 3630.00 wall Scope Total:
15648.5900000000000000
 

landscape

landscape

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Inches)
2"-4" Rock, 2"-4" Local Cobble
Ton 0.00 115.00 %
--Disabled--
2
PopOut


(Inches)
3/4" River Rock, 3/4" Grand Mesa River Rock
Ton 150.00 94.10 %
24.41
150
418.51 46.50 1 225.00 67.21
757.22
3
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Clear Creek
Ton 150.00 71.00 %
54.05
150
744.55 82.73 2 450.00 134.42
1411.70
4
PopOut


(Inches)
Topsoil, Top Soil
TONS 0 50.00 %
90.00
300
1290.00 143.33 3 675.00 201.62
2309.95
5
PopOut
Boulders, Granite Boulders
Ton 0.00 184.05 %
--Disabled--
6
PopOut
Boulder, Boulder Delivery Cost
0 %
150.0
150.00
--Disabled--
8
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
5.08
55.82 6.20 1 225.00 67.21
354.24
9
PopOut
(OLD)
MOB, MOB
0 %
3 675.00 201.62
876.62
10
183.54 900.00 2918.88 landscape Scope Total:
6290.825000000000000000
 

demo

Demo

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 300.00 %
30.00
450
480.00
--Disabled--
2
PopOut
(OLD)
Miscellaneous, Miscellaneous


0 %
20.00
170.00
--Disabled--
3
PopOut
(OLD)
MOB, MOB
0 %
--Disabled--
4
50.00 600.00 650.00 demo Scope Total:
0
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/11/2025 3:11 AM

 
Edit - Landscaping_Software
Grand Total: $ 21939.415000000000000000