🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Jeff Ekstrand Bid #:16511 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Breeze Patio

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Inches)
3/8" Rock, 3/8" Gray Granite Chip
Ton 150.00 62.55 %
36.89
150.00
555.82 29.25 2.00 450.00 134.42
1169.49
3
PopOut
(OLD)
MOB, MOB
0.00 %
1.50 337.50 100.81
438.31
4
38.51 150.00 573.68 Breeze Patio Scope Total:
1918.81
 

Plants and Trees

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
8' Tree, 8' Tree
0.00 500.00 %
50.00
550.00 28.95 1.00 225.00 67.21
871.16
2
PopOut
Plants, Tree/Plant Delivery Cost
0.00 %
275.00
275.00 14.47
289.47
3
PopOut
2" Tree, Tree 2"
0.00 425.00 %
382.50
4207.50 221.45 6.75 1518.75 453.65
6401.35
4
PopOut
15 Gallon Tree, Tree 15 gal
0.00 200.00 %
40.00
440.00 23.16 1.50 337.50 100.81
901.47
5
PopOut
5 Gallon Shrub, Shrub 5 gal
0.00 45.00 %
40.50
445.50 23.45 1.44 324.00 96.78
889.73
6
PopOut
1 Gallon, Perennial 1 gal
0.00 18.00 %
75.60
831.60 43.77 3.36 756.00 225.82
1857.19
7
PopOut
(OLD)
MOB, MOB
0.00 %
4.50 1012.50 302.44
1314.94
8
588.60 275.00 6749.60 Plants and Trees Scope Total:
12525.31
 

Irrigation

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Irrigation Zones, # of zones
ZONE 0.00 322.00 %
193.20
2125.20 111.85 15.00 3375.00 1008.12
6620.17
2
PopOut
Drip, Drip
ZONE 0.00 100.00 %
10.00
110.00 5.79
115.79
3
PopOut
(OLD)
MOB, MOB
0.00 %
4.50 1012.50 302.44
1314.94
4
203.20 0.00 2235.20 Irrigation Scope Total:
8050.90
 

Sod

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Sod, Sod
SQFT 0.00 0.35 %
48.90
250.00
787.85 41.47 3.00 675.00 201.62
1705.94
2 ---
Tilling, Roto-tilling SF
SQFT 0.00 %
1.00 225.00 67.21
292.21
3 --- (OLD)
Grading, Finish Grading SF
SQFT 0.00 %
2.00 450.00 134.42
584.42
4 ---
Compost, Compost
TON 0.00 50.00 %
25.00
275.00 14.47 2.00 450.00 134.42
873.89
5 ---
Sod, Pallet
0.00 1.00 %
9.00
99.00 5.21
104.21
6
PopOut
(OLD)
MOB, MOB
0.00 %
3.00 675.00 201.62
876.62
7
82.90 250.00 1161.85 Sod Scope Total:
4437.29
 

Raised Planters

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Feet)
Wall, Timber Retaining Wall
0.00 %
2 ---
Timbers, Timbers (ea.)
0.00 55.00 %
2.40
150.00
176.40 9.28 16.00 3600.00 1075.32
6157.00
3 ---
Roadbase, Road Base
0.00 35.00 %
0.10
150.00
151.10 7.95
193.05
4 ---
Sand, Sand
0.00 43.00 %
0.10
150.00
151.10 7.95
201.05
5 ---
1-1/2" Rock, 1.5" Rock
0.00 60.00 %
360.00
360.00
--Disabled--
6
PopOut


(Inches)
Topsoil, Topsoil
Yard 0.00 36.25 %
10.88
150.00
269.63 14.19 1.00 225.00 67.21
576.03
7
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
0.44
0.44
--Disabled--
8
PopOut
(OLD)
MOB, MOB
0.00 %
4.50 1012.50 302.44
1314.94
9
373.92 600.00 1108.67 Raised Planters Scope Total:
8442.07
 

Planting Bed

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Mountain Granite
Ton 150.00 70.50 %
117.23
150.00
1439.48 75.76 4.00 900.00 268.83
2684.07
2
PopOut


(Inches)
2"-4" Rock, 2"-4" White Cobble
Ton 150.00 105.80 %
131.38
150.00
1595.18 83.96 4.00 900.00 268.83
2847.97
3
PopOut


(Inches)
Mulch, Cascade Cedar Mulch
Yard 0.00 69.50 %
156.38
300.00
2020.13 106.32 4.00 900.00 268.83
3295.28
4
PopOut


(Inches)
3/8" Rock, 3/8" Gray Granite Chip
Ton 150.00 62.55 %
49.40
150.00
693.43 36.50 2.00 450.00 134.42
1314.35
5
PopOut
Boulders, Colorado Buff Boulders
Ton 0.00 245.65 %
110.54
150.00
260.54
--Disabled--
6
PopOut
Boulder, Boulder Delivery Cost
0.00 %
150.00
150.00 7.89
157.89
7
PopOut
Edging, Edging
FT 0.00 %
6.00 1350.00 403.25
1753.25
8 ---
Edging, sticks
0.00 16.00 %
113.60
1249.60 65.77
1315.37
9
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
32.77
360.47 18.97 4.00 900.00 268.83
1548.27
10
PopOut
(OLD)
MOB, MOB
0.00 %
6.00 1350.00 403.25
1753.25
11
711.30 1050.00 7768.83 Planting Bed Scope Total:
16669.70
 

Firepit Wall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0.00 %
2 --- (OLD)
Wall, Wall Blocks
TONS 0.00 10.50 %
151.20
150.00
1813.20 95.43 10.00 2250.00 672.08
4830.71
3 --- (OLD)
Cap, Caps
TONS 0.00 8.50 %
45.05
495.55 26.08 7.00 1575.00 470.45
2567.08
4 ---
Roadbase, Road base
TONS 0.00 35.00 %
0.10
150.00
151.10 7.95
193.05
5 ---
1-1/2" Rock, 1-1/2" Local River Rock
0.00 60.00 %
318.00
318.00
--Disabled--
6 ---
Sand, Sand
TONS 0.00 43.00 %
0.10
150.00
151.10 7.95
201.05
7
PopOut
(OLD)
MOB, MOB
0.00 %
4.50 1012.50 302.44
1314.94
8
514.45 450.00 2928.95 Firepit Wall Scope Total:
9106.83
 

Trampoline Wall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0.00 %
2 --- (OLD)
Wall, Wall Blocks
TONS 0.00 10.50 %
79.80
150.00
1027.80 54.09 6.00 1350.00 403.25
2835.14
3 --- (OLD)
Cap, Caps
TONS 0.00 8.50 %
23.80
261.80 13.78 4.00 900.00 268.83
1444.41
4 ---
Roadbase, Road base
TONS 0.00 35.00 %
0.10
150.00
151.10 7.95
193.05
5 ---
1-1/2" Rock, 1-1/2" Local River Rock
0.00 60.00 %
168.00
168.00
--Disabled--
6 ---
Sand, Sand
TONS 0.00 43.00 %
0.10
150.00
151.10 7.95
201.05
7
PopOut
(OLD)
MOB, MOB
0.00 %
3.00 675.00 201.62
876.62
8
271.80 450.00 1759.80 Trampoline Wall Scope Total:
5550.27
 

Sport Court Wall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0.00 %
2 --- (OLD)
Wall, Wall Blocks
TONS 0.00 10.50 %
155.40
150.00
1859.40 97.86 10.00 2250.00 672.08
4879.34
3 --- (OLD)
Cap, Caps
TONS 0.00 8.50 %
46.75
514.25 27.07 7.00 1575.00 470.45
2586.77
4 ---
Roadbase, Road base
TONS 0.00 35.00 %
0.10
150.00
151.10 7.95
193.05
5 ---
1-1/2" Rock, 1-1/2" Local River Rock
0.00 60.00 %
330.00
330.00
--Disabled--
6 ---
Sand, Sand
TONS 0.00 43.00 %
0.10
150.00
151.10 7.95
201.05
7
PopOut
(OLD)
MOB, MOB
0.00 %
4.50 1012.50 302.44
1314.94
8
532.35 450.00 3005.85 Sport Court Wall Scope Total:
9175.15
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/11/2025 10:07 AM

 
Edit - Landscaping_Software
Grand Total: $ 75876.33