🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Jeff Ekstrand Bid #:16511 - install

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for:
Area: Trampoline Wall
Parent Item: Block Retaining Wall

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

Trampoline Wall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1

(Feet)
Wall Calculation, Block Retaining Wall
0 %
2 --- (OLD)
Wall, Wall Blocks
TONS 0 10.50 %
79.80
150.0
1027.80 54.09 6 1350.00 403.25
2835.14
3 --- (OLD)
Cap, Caps
TONS 0 8.50 %
23.80
261.80 13.78 4 900.00 268.83
1444.41
4 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 7.95
193.05
5 ---
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
168.00
168.00
--Disabled--
6 ---
Sand, Sand
TONS 0 43.00 %
0.10
150.0
151.10 7.95
201.05
8
271.80 450.00 1759.80 Trampoline Wall Scope Total:
5550.270000000000000000
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 10:43 PM

 
Edit - Landscaping_Software
Grand Total: $ 5550.270000000000000000