🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Mike Schmidke Bid #:16737 - install

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for: Area: Berm Parent Item: Timber Retaining Wall

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

Berm

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1

(Feet)
Wall, Timber Retaining Wall
0 %
2 ---
Timbers, Timbers (ea.)
0 55.00 %
2.25
150.0
174.75 52.20 15.00 3375.00 1008.12
5825.07
3 ---
Roadbase, Road Base
0 35.00 %
0.10
150.0
151.10 45.13
230.23
4 ---
Sand, Sand
0 43.00 %
0.10
150.0
151.10 45.13
238.23
5 ---
1-1/2" Rock, 1.5" Rock
0 60.00 %
0.40
41
41.40
--Disabled--
6

(Inches)
1-1/2" Rock, 1-1/2" White River Rock
Ton 150.00 95.30 %
48.36
150
681.90 203.69 1 225.00 67.21
1177.80
7
Boulders, Colorado Buff Boulders
Ton 0.00 245.65 %
61.41
150
825.54 246.59 3 675.00 201.62
1948.75
8
Boulder, Boulder Delivery Cost
0 %
150.0
150.00 44.81
194.81
9
5 Gallon Evergreen, Evergreen shrub, 5 gal
0 80.00 %
24.00
264.00 78.86 1.50 337.50 100.81
781.17
10
Plants, Tree/Plant Delivery Cost
0 %
275.0
275.00 82.14
357.14
11
1 Gallon, Perennial 1 gal
0 18.00 %
55.80
613.80 183.34 2.48 558.00 166.68
1521.82
13 (OLD)
Fabric, Fabric
SQFT 0 87.00 %
1.94
21.29 6.36 1 225.00 67.21
319.86
14 (OLD)
MOB, MOB
0 %
4 900.00 268.83
1168.83
15
264.35 1366.00 4269.89 Berm Scope Total:
15835.145750000000000000
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/15/2025 8:53 PM

 
Edit - Landscaping_Software
Grand Total: $ 15835.145750000000000000