Customer: Schyler Egan Encore at Somerset Bid #:17240 - install |
Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details
|
Park Rock |
Demo |
Discount: 0.00 % | Customer can decline on the proposal: False |
| Item # | We Install | Error-CallTechSupport | ReuseMaterials |
L (Feet) |
W (Feet) |
H |
Enabled | Item | Difficulty | Amount | Units | Color | Dump Cost | UnitPrice | misc % | misc | tax |
Other+ Delivery |
Subtotal | Profit Margin Materials |
Labor Hours |
Labor Cost | GC Hours | Profit Margin Subs |
Profit Margin Labor |
total | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 |
|
Demo, Demo Sod
|
SQFT | 200.00 | % |
20.00
|
300.00
|
520.00 | 155.32 | 2.00 | 450.00 | 134.42 |
1259.74
|
|||||||||||||||||
| 2 |
|
(OLD)
Miscellaneous, Miscellaneous
|
0.00 | % |
|
150.00 | 44.81 | 900.00 | 268.83 |
1363.64
|
||||||||||||||||||||
| 3 |
|
|
|
(Inches) |
Topsoil, Topsoil
|
Yard | 0.00 | 36.25 | % |
9.06
|
150.00
|
249.69 | 74.58 | 1.00 | 225.00 | 67.21 |
616.48
|
|||||||||||||
| 4 |
|
|
|
(Inches) |
1-1/2" Rock, 1-1/2" Local River Rock
|
Ton | 0.00 | 60.00 | % |
75.00
|
150.00
|
975.00 | 291.23 | 3.00 | 675.00 | 201.62 |
2142.85
|
|||||||||||||
| 5 |
|
|
|
Fabric, Fabric Custom
|
SQFT | 0.00 | 87.00 | % |
7.98
|
|
87.73 | 26.20 | 1.00 | 225.00 | 67.21 |
406.14
|
||||||||||||||
| 6 |
|
Edging, Edging
|
FT | 0.00 | % |
|
|
2.00 | 450.00 | 134.42 |
584.42
|
|||||||||||||||||||
| 7 | --- |
Edging, sticks
|
0.00 | 16.00 | % |
28.80
|
|
316.80 | 94.63 |
411.43
|
||||||||||||||||||||
| 8 |
|
(OLD)
Fabric, Fabric
|
SQFT | 0.00 | 87.00 | % |
11.96
|
|
11.96 |
|
||||||||||||||||||||
| 9 |
|
(OLD)
MOB, MOB
|
0.00 | % |
|
|
3.00 | 675.00 | 201.62 |
876.62
|
||||||||||||||||||||
| 152.80 | 750.00 | 2311.18 | Park Rock | Scope Total: | 7661.32 |