Customer: Allen Blenkers Bid #:17413 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Concrete Path

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
2
250.00 0.00 2750.00 Concrete Path Scope Total:
3042.50
 

Paver Path

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Concrete, Concrete,Misc.
0.00 %
200.00
2200.00 3.00
2492.50
2
PopOut
Pavers, Paver Sidewalk SQFT
0.00 %
3 ---
Pavers, Pavers
0.00 7.00 %
32.20
150.00
504.20 150.61 5.00 1125.00 336.04
2115.85
4 ---
Poli Sand, Poli-sand
0.00 60.00 %
6.00
66.00 19.71
85.71
5 ---
Sand, Sand
0.00 43.00 %
4.30
150.00
197.30 58.93
256.23
6 ---
Roadbase, Road base
0.00 35.00 %
7.00
150.00
227.00 67.81
294.81
7
PopOut


(Inches)
Topsoil, Top Soil
TONS 0.00 50.00 %
5.00
150.00
205.00 61.23 1.00 225.00 67.21
558.44
8
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
9
PopOut
(OLD)
MOB, MOB
0.00 %
1.00 225.00 67.21
292.21
10
254.50 600.00 3399.50 Paver Path Scope Total:
6095.75
 

Stepper Path

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
6.00
150.00
216.00 64.52 1.00 225.00 67.21
572.73
2
PopOut


(Inches)
Topsoil, Topsoil
Yard 0.00 36.25 %
3.63
150.00
189.88 56.72 1.00 225.00 67.21
538.81
3
PopOut
Steppers, 2' by 2' Steppers
0.00 35.00 %
14.00
154.00 46.00 1.00 225.00 67.21
492.21
4
PopOut
Concrete, Concrete,Misc.
0.00 %
200.00
2200.00 3.00
2492.50
5
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
0.62
6.86 2.05 1.00 225.00 67.21
301.12
6
PopOut
(OLD)
MOB, MOB
0.00 %
1.00 225.00 67.21
292.21
7
224.25 300.00 2766.74 Stepper Path Scope Total:
4689.58
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 1:09 PM

 
Edit - Landscaping_Software
Grand Total: $ 13827.83