324234

354

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Sod, Sod
SQFT 0 0.35 %
19.36
250.00
462.90 138.27 1 225.00 67.21
893.38
2 ---
Tilling, Roto-tilling SF
SQFT 0 %
1 225.00 67.21
292.21
3 --- (OLD)
Grading, Finish Grading SF
SQFT 0 %
1 225.00 67.21
292.21
4 ---
Compost, Compost
TON 0 50.00 %
10.00
110.00 32.86 1 225.00 67.21
435.07
5 ---
Sod, Pallet
0 1.00 %
3.00
33.00 9.86
42.86
6
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0 %
7 ---
Wall, Wall Blocks
TONS 0 12.50 %
670.00
450.0
7820.00 2335.84 34 7650.00 2285.06
20090.90
8 ---
Cap, Caps
TONS 0 10.00 %
200.00
2200.00 657.14 24 5400.00 1612.99
9870.13
9 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 45.13
230.23
10 ---
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
11 ---
Sand, Sand
TONS 0 43.00 %
0.20
150.0
152.20 45.46
281.66
12
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0 %
13 ---
Wall, Wall Blocks
TONS 0 12.50 %
20 4500.00 1344.16
5844.16
14 ---
Cap, Caps
TONS 0 10.00 %
200.00
2200.00 657.14 24 5400.00 1612.99
9870.13
15 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 45.13
230.23
16 ---
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
18
PopOut
MOB, MOB
0 %
36 8100.00 2419.48
10519.48
19
1102.96 1300.00 13432.50 324234 Scope Total:
59174.315000000000000000
 
 

This bid Created By: justinyeater@atpslandscaping.com at 12/12/2025 4:14 AM


This bid last edited by: at 12/16/2025 1:55 AM

 
Edit - Landscaping_Software
Grand Total: $ 59174.315000000000000000