🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Town of Kersey Bid #:2209 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Landscape drainage

landscape for proper drainage and beautification

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Rock
SQFT 500.00 %
50.00
750.00
1300.00 388.31 5.00 1125.00 336.04
3149.35
2
PopOut


(Inches)
2"-4" Rock, 2"-4" Local Cobble
Ton 0.00 115.00 %
172.50
150.00
2047.50 611.59 5.00 1125.00 336.04
4120.13
3
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0.00 %
4 --- (OLD)
Wall, Wall Blocks
TONS 0.00 10.50 %
154.35
150.00
1847.85 551.96 12.00 2700.00 806.49
5906.30
5 --- (OLD)
Cap, Caps
TONS 0.00 8.50 %
62.05
682.55 203.88 9.00 2025.00 604.87
3516.30
6 --- (OLD)
Roadbase, Road base
TONS 0.00 35.00 %
0.10
150.00
151.10 45.13
230.23
7 --- (OLD)
1-1/2" Rock, 1-1/2" Local River Rock
0.00 60.00 %
438.00
438.00
--Disabled--
8
PopOut
(OLD)
Miscellaneous, Miscellaneous


0.00 %
150.00
--Disabled--
9
PopOut


(Inches)
Topsoil, Top Soil
TONS 0.00 50.00 %
65.00
150.00
865.00 258.38 4.00 900.00 268.83
2292.21
11
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
7.34
80.78 24.13 1.00 225.00 67.21
397.13
12
PopOut
(OLD)
MOB, MOB
0.00 %
14.00 3150.00 940.91
4090.91
13
955.34 1650.00 7778.78 Landscape drainage Scope Total:
24275.29
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 6:14 PM

 
Edit - Landscaping_Software
Grand Total: $ 24275.29