🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Howard Morgan Bid #:2536 - install

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for:
Area: Morgan front bed renovation
Parent Item: Demo Rock

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

Morgan front bed renovation

Remove rock, install new fabric, replace rock

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
Demo, Demo Rock
SQFT 200.00 %
20.00
300.00
520.00 155.32 2.00 470.00 140.39
1285.71
2

(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
153.23 3.00 705.00 210.58
915.58
3

(Feet)
Wall Calculation, Block Retaining Wall
0.00 %
4 --- (OLD)
Wall, Wall Blocks
TONS 0.00 10.50 %
63.00
150.00
843.00 251.81 7.00 1645.00 491.36
3231.17
5 --- (OLD)
Cap, Caps
TONS 0.00 8.50 %
37.40
411.40 122.89 6.00 1410.00 421.17
2365.46
6 ---
Roadbase, Road base
TONS 0.00 35.00 %
0.10
150.00
151.10 45.13
230.23
7 --- (OLD)
1-1/2" Rock, 1-1/2" Local River Rock
0.00 60.00 %
264.00
264.00
--Disabled--
8 ---
Sand, Sand
TONS 0.00 43.00 %
0.10
150.00
150.10
--Disabled--
9

(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
6.00
150.00
216.00 64.52 1.00 235.00 70.19
585.71
11 (OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
3.81
41.87 12.51 1.00 235.00 70.19
359.57
12 (OLD)
MOB, MOB
0.00 %
6.00 1410.00 421.17
1831.17
13
404.41 1050.00 2857.47 Morgan front bed renovation Scope Total:
11447.45
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 12:26 AM

 
Edit - Landscaping_Software
Grand Total: $ 11447.45