🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Chuck Bartholomew Bid #:3071 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

South Drive bed

Bed and breeze apth

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Sod
SQFT 100.00 %
10.00
150
260.00 5.31 1 225.00 4.59
494.90
2
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
18.00
150
348.00 7.10 1 225.00 4.59
584.69
3
PopOut


(Inches)
Breeze, Grey Breeze
Ton 0.00 39.00 %
7.80
150
235.80 4.81 1 225.00 4.59
470.20
4
PopOut
Edging, Edging
FT 0 %
2 450.00 9.18
459.18
5 ---
Edging, sticks
0 16.00 %
33.60
369.60 7.54
377.14
6
PopOut


(Inches)
Mulch, Choice Brown Mulch
SQ YD 0.00 60.00 %
3.00
150
183.00 3.73 1 225.00 4.59
416.32
7
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
3.06
33.65 0.69 1 225.00 4.59
263.93
8
PopOut
(OLD)
MOB, MOB
0 %
1 225.00 4.59
229.59
9
75.46 600.00 1430.05 South Drive bed Scope Total:
3295.954500000000000000
 

sod

sod

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Sod, Sod
SQFT 0 0.35 %
74.90
250.38
1074.28 33.23 4 900.00 27.84
2035.35
2 ---
Tilling, Roto-tilling SF
SQFT 0 %
2 450.00 9.18
459.18
3 --- (OLD)
Grading, Finish Grading SF
SQFT 0 %
1 225.00 4.59
229.59
4 --- (OLD)
Compost, Compost
TON 0 50.00 %
35.00
385.00 7.86 2 450.00 9.18
852.04
5 ---
Sod, Pallet
0 1.00 %
15.00
165.00 3.37
168.37
6
PopOut
Edging, Edging
FT 0 %
1 225.00 4.59
229.59
7 ---
Edging, sticks
0 16.00 %
19.20
211.20 4.31
215.51
8
PopOut
(OLD)
MOB, MOB
0 %
2 450.00 9.18
459.18
9
144.10 250.38 1835.48 sod Scope Total:
4648.8100000000000000
 

Irrigation

Front and north side irrgation

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Backflow, Backflow
ZONE 0 150.00 %
15.00
165.00 5.10
170.10
2
PopOut
Controller, Clock
ZONE 0 150.00 %
15.00
165.00 5.10
170.10
3
PopOut
(OLD)
Irrigation Zones, # of zones
ZONE 0 322.00 %
161.00
1771.00 54.77 31.25 7031.25 217.46
9074.48
5
PopOut
(OLD)
MOB, MOB
0 %
5 1125.00 34.79
1159.79
6
210.00 0.00 2310.00 Irrigation Scope Total:
11017.3300000000000000
 

Demo existing weeds

Demo

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
Demo, Demo Sod
SQFT 300.00 %
30.00
450
780.00 24.12 5 1125.00 34.79
1963.91
2
PopOut
(OLD)
Miscellaneous, Miscellaneous


0 %
25.00
275.00 5.61 450.00 9.18
739.79
3
PopOut
(OLD)
MOB, MOB
0 %
1 225.00 6.96
231.96
4
55.00 450.00 1055.00 Demo existing weeds Scope Total:
2935.6600000000000000
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 10:28 PM

 
Edit - Landscaping_Software
Grand Total: $ 21897.754500000000000000