🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: James Harding Bid #:3617 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Trees

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
5 Gallon Shrub, Shrub 5 gal
0 45.00 %
45.00
495.00 55.00 1.60 360.00 107.53
1017.53
2
PopOut
Plants, Tree/Plant Delivery Cost
0 %
275.0
275.00 30.56
305.56
3
PopOut
(OLD)
MOB, MOB
0 %
1.5 337.50 100.81
438.31
4
45.00 275.00 770.00 Trees Scope Total:
1761.4000000000000000
 

Retaining Wall Fill

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Inches)
Topsoil, Top Soil
TONS 0 50.00 %
160.00
450
2210.00 245.56 8 1800.00 537.66
4793.22
2
PopOut
(OLD)
Concrete, Concrete,Boom Pump
0 600.00 %
3
PopOut


(Inches)
3/8" Pea Gravel, 3/8" pea gravel
TONS 0 60.00 %
30.00
330.00 36.67 2 450.00 134.42
951.09
4
PopOut
(OLD)
Fabric, Fabric
SQFT 0 87.00 %
3.62
39.88 4.43 1 225.00 67.21
336.52
5
PopOut
(OLD)
MOB, MOB
0 %
3 675.00 201.62
876.62
6
193.62 450.00 2579.88 Retaining Wall Fill Scope Total:
6957.445000000000000000
 

Retaining Wall

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0 %
2 --- (OLD)
Wall, Wall Blocks
TONS 0 10.50 %
179.55
150.0
2125.05 236.12 14 3150.00 940.91
6452.08
3 --- (OLD)
Cap, Caps
TONS 0 8.50 %
72.25
794.75 88.31 10 2250.00 672.08
3805.14
4 ---
Roadbase, Road base
TONS 0 35.00 %
0.10
150.0
151.10 16.79
201.89
5 ---
1-1/2" Rock, 1-1/2" Local River Rock
0 60.00 %
510.00
510.00
--Disabled--
6 ---
Sand, Sand
TONS 0 43.00 %
0.10
150.0
151.10 16.79
209.89
8
PopOut
(OLD)
MOB, MOB
0 %
6 1350.00 403.25
1753.25
9
769.50 450.00 3814.50 Retaining Wall Scope Total:
12806.130000000000000000
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/15/2025 1:21 AM

 
Edit - Landscaping_Software
Grand Total: $ 21524.975000000000000000