🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: David Kennedy West Ridge Academy Charter Bid #:3936 - install

Click to jump to:
+ Quick Add New Scope/Area
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Building Back

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Miscellaneous, Miscellaneous


0.00 %
80.00
880.00 262.86 900.00 268.83
2311.69
2
PopOut
Demo, Demo Sod
SQFT 100.00 %
10.00
150.00
260.00 77.66 2.00 450.00 134.42
922.08
3
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
9.00
150.00
249.00 74.38 1.00 225.00 67.21
615.59
4
PopOut
(OLD)
Concrete, Concrete,Grey Broom
0.00 13.00 %
188.50
2073.50 619.36 3.00 87.37
3072.73
5
PopOut
(OLD)
Concrete, Concrete,Boom Pump
0.00 600.00 %
60.00
660.00 197.14 1.00 29.12
983.76
6
PopOut


(Inches)
5"-12" Rock, 5"-12" Horizon Cobble
Ton 150.00 105.15 %
25.52
150.00
430.67 128.64 1.00 225.00 67.21
851.52
7
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
1.27
13.96 4.17 1.00 225.00 67.21
310.34
8
PopOut
(OLD)
MOB, MOB
0.00 %
2.00 450.00 134.42
584.42
9
374.29 450.00 4567.13 Building Back Scope Total:
9652.13
 

Building Front

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1
PopOut
(OLD)
Miscellaneous, Miscellaneous


0.00 %
40.00
440.00 131.43 225.00 67.21
863.64
2
PopOut


(Feet)
Wall Calculation, Block Retaining Wall
0.00 %
3 --- (OLD)
Wall, Wall Blocks
TONS 0.00 10.50 %
4.20
150.00
196.20 58.61 1.00 225.00 67.21
547.02
4 --- (OLD)
Cap, Caps
TONS 0.00 8.50 %
4.25
46.75 13.96 1.00 225.00 67.21
352.92
5 ---
Roadbase, Road base
TONS 0.00 35.00 %
0.10
150.00
151.10 45.13
230.23
6 ---
1-1/2" Rock, 1-1/2" Local River Rock
0.00 60.00 %
30.00
330.00 98.57 2.00 450.00 134.42
1012.99
7 ---
Sand, Sand
TONS 0.00 43.00 %
0.10
150.00
151.10 45.13
238.23
8
PopOut
Demo, Demo Rock
SQFT 200.00 %
20.00
300.00
520.00 155.32 2.00 450.00 134.42
1259.74
9
PopOut


(Inches)
1-1/2" Rock, 1-1/2" Local River Rock
Ton 0.00 60.00 %
113.81 2.00 450.00 134.42
584.42
11
PopOut
(OLD)
Fabric, Fabric
SQFT 0.00 87.00 %
2.54
27.92 8.34 1.00 225.00 67.21
328.46
12
PopOut
(OLD)
MOB, MOB
0.00 %
2.00 450.00 134.42
584.42
13
126.71 900.00 2293.74 Building Front Scope Total:
6853.59
 
 

This bid Created By: at 1/1/0001 12:00 AM


This bid last edited by: at 12/14/2025 11:40 PM

 
Edit - Landscaping_Software
Grand Total: $ 16505.72