🔒 This bid is locked for editing because a proposal has been generated.


 

Customer: Brian Lemay Bid #:9778 - install

Click to jump to:
Auto-Reload
Bid Not Yet Awarded, See Bid Details

Embedded edit pop-up window for: Area: Planting Bed Parent Item: Compost

Use CTRL and + or CTRL and - on your keyboard to zoom in and out to make the text bigger. To reset it, hold CTRL and press 0.

Planting Bed

PopOut->

Edit->

Discount: 0.00 % Customer can decline on the proposal: False
Item # We Install Error-CallTechSupport ReuseMaterials L
(Feet)
W
(Feet)
H
Enabled Item Difficulty Amount Units Color Dump Cost UnitPrice misc % misc tax Other+
Delivery
Subtotal Profit
Margin
Materials
Labor
Hours
Labor Cost GC Hours Profit Margin Subs Profit
Margin
Labor
total
1

(Inches)
Compost, Compost
Yard 0.00 50.00 %
100.00
150
1250.00 373.38 3 675.00 201.62
2500.00
2 (OLD)
Miscellaneous, Miscellaneous


0 %
450.00 134.42
584.42
3

(Inches) (OLD)
3/8" Rock, 3/8" Gray Granite Chip
Ton 150.00 62.55 %
93.19
150
1175.06 350.99 3 675.00 201.62
2402.67
4

(Inches) (OLD)
Mulch, Washington Cedar Mulch
Yard 0.00 72.70 %
312.61
450
3888.71 1161.56 6 1350.00 403.25
6803.52
5 (OLD)
Boulders, Brownstone
TONS 0.00 250.00 %
150.00
1650.00 492.86 6 1350.00 403.25
3896.11
6
Boulder, Boulder Delivery Cost
0 %
150.0
150.00 44.81
194.81
7 (OLD)
Edging, Edging
FT 0 %
6 1350.00 403.25
1753.25
9 (OLD)
Fabric, Fabric
SQFT 0 87.00 %
36.70
403.69 120.58 4 900.00 268.83
1693.10
10 (OLD)
MOB, MOB
0 %
7.5 1687.50 504.06
2191.56
11
807.70 900.00 9784.67 Planting Bed Scope Total:
23665.157000000000000000
 

This bid Created By: joshyeater@atpslandscaping.com at 7/21/2025 1:45 PM


This bid last edited by: at 12/15/2025 12:57 PM

 
Edit - Landscaping_Software
Grand Total: $ 23665.157000000000000000