Materials Sheet

NOTE: You have to reload this page before the materials sheet will update, hit F5.

Category Units Amount Cost To Buy List Total Purchased, Units Total Purchased, Dollar Amount
Sod SQFT 22052.00 $ 6760.96 Sod(11026.00), Pallet(11026.00), 0 0 See Invoice List->
Irrigation Zones ZONE 20.00 $ 6440.00 # of zones(20.00), 0 0 See Invoice List->
Fabric SQFT 6360.00 $ 461.11 Fabric(6010.00), Fabric(350.00), 0 0 See Invoice List->
Edging FT 1638.00 $ 3280.00 Edging(1433.00), sticks(205.00), 0 0 See Invoice List->
2"-4" Rock TONS 5.50 $ 635.10 2"-4" Horizon Cobble(5.50), 0 0 See Invoice List->
Boulders TONS 38.00 $ 5620.00 Black Granite Boulders(35.00), Black Granite Boulders(3.00), 0 0 See Invoice List->
Mulch SQ YD 45.50 $ 4695.00 Shredded Redwood Mulch(45.50), 0 0 See Invoice List->
Pavers 3425.00 $ 16725.00 Paver Patio SQFT(1650.00), Pavers(1775.00), 0 0 See Invoice List->
Topsoil TONS 13.00 $ 800.00 Top Soil(13.00), 0 0 See Invoice List->
Demo SQFT 15599.00 $ 4000.00 Demo Sod(12599.00), Demo Sod(3000.00), 0 0 See Invoice List->
Tilling SQFT 11026.00 $ 0.00 Roto-tilling SF(11026.00), 0 0 See Invoice List->
Grading SQFT 11026.00 $ 0.00 Finish Grading SF(11026.00), 0 0 See Invoice List->
Compost TON 34.00 $ 1700.00 Compost(34.00), 0 0 See Invoice List->
180005.00 $ 298250.00 Miscellaneous Subcontractor(1.00), Miscellaneous Subcontractor(1.00), Miscellaneous Subcontractor(180000.00), Manager Prep(1.00), Miscellaneous Subcontractor(1.00), Miscellaneous Subcontractor(1.00), 0 0 See Invoice List->
Concrete 186.00 $ 4670.00 Concrete,Grey Broom(185.00), Concrete,Boom Pump(1.00), 0 0 See Invoice List->
2.5" Tree 1.00 $ 600.00 Tree, 2.5"(1.00), 0 0 See Invoice List->
15 Gallon Tree 3.00 $ 600.00 Tree 15 gal(3.00), 0 0 See Invoice List->
5 Gallon Shrub 26.00 $ 1170.00 Shrub 5 gal(26.00), 0 0 See Invoice List->
1 Gallon 145.00 $ 2610.00 Perennial 1 gal(145.00), 0 0 See Invoice List->
Miscellaneous 19261.00 $ 51848.00 Miscellaneous(8.00), Miscellaneous(0.00), Miscellaneous(1.00), Miscellaneous(19240.00), Miscellaneous(1.00), Miscellaneous(1.00), Miscellaneous(1.00), Miscellaneous(3.00), Miscellaneous(1.00), Miscellaneous(1.00), Miscellaneous(1.00), Miscellaneous(0.00), Miscellaneous(1.00), Miscellaneous(1.00), Miscellaneous(1.00), 0 0 See Invoice List->
3"-6" Rock Ton 14.00 $ 2051.40 3-6" Grand Mesa Gray River Rock(14.00), 0 0 See Invoice List->
8' Tree 4.00 $ 2000.00 8' Tree(4.00), 0 0 See Invoice List->
6' Tree 2.00 $ 750.00 6' Tree(2.00), 0 0 See Invoice List->


Misc Items Needed:

Item Description Amount Needed Total Purchased, Units Total Purchased, Dollar Amount

Belgard Slab

8.00 0.00 0.01 See Invoice List->

extra labor for inlay

0.00 0 0 See Invoice List->

Address Boulder

1.00 0 0 See Invoice List->

Coastal Source

19240.00 0 0 See Invoice List->

Luxor

1.00 0 0 See Invoice List->

Filtrific System

1.00 0 0 See Invoice List->

Pump/System

1.00 0 0 See Invoice List->

Core Boulder

3.00 0 0 See Invoice List->

Spade 4 Trees

1.00 0 0 See Invoice List->

Service Tech clock wiring

1.00 0 0 See Invoice List->

Log Set

1.00 0 0 See Invoice List->

Lava Rock or Glass

0.00 0 0 See Invoice List->

Trenching, sleeving

1.00 0 0 See Invoice List->

equipmental rental

1.00 0 0 See Invoice List->

additional Labor Demo

1.00 0 0 See Invoice List->




Sod Irrigation Zones Fabric Edging 2"-4" Rock Boulders Mulch Pavers Topsoil Demo Tilling Grading Compost Concrete 2.5" Tree 15 Gallon Tree 5 Gallon Shrub 1 Gallon Miscellaneous MOB 3"-6" Rock 8' Tree 6' Tree Total
Productive Labor Hours 42.0000 120.0000 18.0000 48.0000 6.0000 114.0000 30.0000 534.0000 12.0000 90.0000 18.0000 30.0000 27.0000 0.00 0.00 2.2500 6.7500 12.4800 34.8000 462.0000 0.00 15.0000 12.0000 9.0000 1643.2800
GC Labor Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 116.00 7.00 0 0 0 0 0 0 0 0 0 123.00
MOB Labor Hours 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 582.0000 0.00 0.00 0.00 582.0000
Crew Labor Hours 14.00 40.00 6.00 16.00 2.00 38.00 10.00 178.00 4.00 30.00 6.00 10.00 9.00 0 0 0.75 2.25 4.16 11.60 154.00 0 5.00 4.00 3.00 547.76
Crew MOB Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 194.00 0 0 0 194.00
Edit - Landscaping_Software demo
mob
demo
mob
pavers
pavers
poli sand
sand
roadbase
mob
miscellaneous
concrete
concrete
miscellaneous
sod
tilling
grading
compost
sod
mob
edging
edging
mob
mulch
fabric
boulders
boulder
miscellaneous
3"-6" rock
miscellaneous
mob
miscellaneous
miscellaneous
mob
water feature
topsoil
fabric
2"-4" rock
miscellaneous
mob
boulders
boulder
miscellaneous
1 gallon
plants
mob
5 gallon shrub
2.5" tree
8' tree
6' tree
15 gallon tree
miscellaneous
irrigation zones
mob
controller
miscellaneous
mob
miscellaneous
miscellaneous
mob
miscellaneous
mob
miscellaneous


miscellaneous