Materials Sheet

NOTE: You have to reload this page before the materials sheet will update, hit F5.

Category Units Amount Cost To Buy List Total Purchased, Units Total Purchased, Dollar Amount
Fabric SQFT 503.00 $ 7.47 Fabric(103.00), Fabric(400.00), 0 0 See Invoice List->
Edging FT 31.00 $ 64.00 Edging(27.00), sticks(4.00), 0 0 See Invoice List->
1-1/2" Rock TONS 3.00 $ 330.00 1-1/2" Local River Rock(3.00), 0 0 See Invoice List->
2"-4" Rock TONS 2.50 $ 458.75 2"-4" Grey Cobble(2.50), 0 0 See Invoice List->
Boulders TONS 0.50 $ 272.83 Colorado Buff Boulders(0.50), 0 0 See Invoice List->
Mulch SQ YD 1.50 $ 259.05 Washington Cedar Mulch(1.50), 0 0 See Invoice List->
Topsoil TONS 2.00 $ 250.00 Top Soil(2.00), 0 0 See Invoice List->
Demo SQFT 103.00 $ 250.00 Demo Sod(103.00), 0 0 See Invoice List->
2" Tree 1.00 $ 425.00 Tree 2"(1.00), 0 0 See Invoice List->
15 Gallon Tree 2.00 $ 400.00 Tree 15 gal(2.00), 0 0 See Invoice List->
1 Gallon 7.00 $ 126.00 Perennial 1 gal(7.00), 0 0 See Invoice List->
Miscellaneous 1.00 $ 500.00 Miscellaneous(1.00), 0 0 See Invoice List->


Misc Items Needed:

Item Description Amount Needed Total Purchased, Units Total Purchased, Dollar Amount

Pump

1.00 0 0 See Invoice List->




Fabric Edging 1-1/2" Rock 2"-4" Rock Boulders Mulch Topsoil Demo 2" Tree 15 Gallon Tree 1 Gallon Miscellaneous MOB Total
Productive Labor Hours 3.0000 3.0000 3.0000 3.0000 3.0000 3.0000 3.0000 3.0000 2.2500 4.5000 1.6800 27.0000 0.00 59.4300
GC Labor Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0
MOB Labor Hours 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.0000 18.0000
Crew Labor Hours 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.75 1.50 0.56 9.00 0 19.81
Crew MOB Hours 0 0 0 0 0 0 0 0 0 0 0 0 6.00 6.00
Edit - Landscaping_Software demo
mob
mulch
fabric
topsoil
edging
edging
15 gallon tree
plants
mob
2" tree
1 gallon
water feature
water feature
water feature
mob
1-1/2" rock
fabric
2"-4" rock
boulders
boulder
miscellaneous