Materials Sheet

NOTE: You have to reload this page before the materials sheet will update, hit F5.

Category Units Amount Cost To Buy List Total Purchased, Units Total Purchased, Dollar Amount
Sod SQFT 1040.00 $ 462.00 Sod(520.00), Pallet(520.00), 0 0 See Invoice List->
Irrigation Zones ZONE 2.00 $ 644.00 # of zones(2.00), 0 0 See Invoice List->
Fabric SQFT 1255.00 $ 90.99 Fabric(1255.00), 0 0 See Invoice List->
Edging FT 221.00 $ 448.00 Edging(193.00), sticks(28.00), 0 0 See Invoice List->
1-1/2" Rock TONS 8.00 $ 630.00 1-1/2" Local River Rock(8.00), 0 0 See Invoice List->
Breeze 1.50 $ 208.50 Grey Breeze(1.50), 0 0 See Invoice List->
Mulch SQ YD 4.50 $ 555.00 Shredded Redwood Mulch(4.50), 0 0 See Invoice List->
Demo SQFT 1000.00 $ 250.00 Demo Sod(1000.00), 0 0 See Invoice List->
Tilling SQFT 520.00 $ 0.00 Roto-tilling SF(520.00), 0 0 See Invoice List->
Grading SQFT 520.00 $ 0.00 Finish Grading SF(520.00), 0 0 See Invoice List->
Compost TON 2.00 $ 100.00 Compost(2.00), 0 0 See Invoice List->
Concrete 223.00 $ 4226.00 Concrete,Grey Broom(202.00), Concrete,Stairs(20.00), Concrete,Boom Pump(1.00), 0 0 See Invoice List->
2.5" Tree 1.00 $ 600.00 Tree, 2.5"(1.00), 0 0 See Invoice List->
2" Tree 2.00 $ 850.00 Tree 2"(2.00), 0 0 See Invoice List->
15 Gallon Tree 3.00 $ 600.00 Tree 15 gal(3.00), 0 0 See Invoice List->
5 Gallon Shrub 6.00 $ 270.00 Shrub 5 gal(6.00), 0 0 See Invoice List->
1 Gallon 4.00 $ 72.00 Perennial 1 gal(4.00), 0 0 See Invoice List->
3 Gallon Shrub 1.00 $ 31.00 3 Gallon Shrub(1.00), 0 0 See Invoice List->






Sod Irrigation Zones Fabric Edging 1-1/2" Rock Breeze Mulch Demo Tilling Grading Compost Concrete 2.5" Tree 2" Tree 15 Gallon Tree 5 Gallon Shrub 1 Gallon MOB 3 Gallon Shrub Total
Productive Labor Hours 6.0000 37.5000 3.0000 9.0000 12.0000 3.0000 3.0000 6.0000 3.0000 3.0000 3.0000 0.00 2.2500 4.5000 6.7500 2.8800 0.9600 0.00 6.0000 111.8400
GC Labor Hours 0 0 0 0 0 0 0 0 0 0 0 7.00 0 0 0 0 0 0 0 7.00
MOB Labor Hours 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31.5000 0.00 31.5000
Crew Labor Hours 2.00 12.50 1.00 3.00 4.00 1.00 1.00 2.00 1.00 1.00 1.00 0 0.75 1.50 2.25 0.96 0.32 0 2.00 37.28
Crew MOB Hours 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10.50 0 10.50
Edit - Landscaping_Software demo
mob
mulch
fabric
1-1/2" rock
breeze
edging
edging
concrete
concrete
sod
tilling
grading
compost
sod
mob
irrigation zones
mob
drip
2.5" tree
plants
mob
2" tree
15 gallon tree
5 gallon shrub
3 gallon shrub
1 gallon
concrete