Create New Comment

No comments on this bid yet.



Design
0 Files
Mapping
0 Files
Pictures
0 Files
Receipts
0 Files
Subcontractors
0 Files





Special Excel Upload Only (Do Not Use)
0 Files

To upload a file, click on a folder above (such as "Design").

 

Images/Files from all other bids from this customer

Design
0 Files
Mapping
0 Files
Pictures
0 Files
Receipts
0 Files
Subcontractors
0 Files

TODO: Charts can go here (wait for when we do the reports, and steal the partial view)

I hear it's amazing when the famous purple stuffed worm in flap-jaw space with the tuning fork does a raw blink on Hara-Kiri Rock. I need scissors! 61!

Episode 1 New York. Here in the city where dreams come true and desires rule, something is being bought, sold and thrown away, even as we speak. But behind the scenes of business as usual, the nefarious "J.E. (Junker Expensive Corporation)" lines its already bloated coffers with profits from worthless products. As J.E. swindlers yet another innocent into purchasing high-priced junk, the FBI mobilizes a top-secret task force to put a stop to the menace. Now, the city's best-kept secret spy is out there, briefed and ready to protect the people from "J.E.," the catalogue of conspiracy -- just call him "2.5 (Two-point-five)."

Submit History




Signing platform: Don't use this until Justin says it is ready.

Click here to replace signing links with the new signing platform (you have to do this every time)


Latest proposal sent out:

Sent Item # 3400

Date/Time Submitted Sent By PandaDoc Document ID Link Result Grand Total At the Time
Wednesday, November 26, 2025 9:27:19 AM mikegarcia@atpslandscaping.com MQwqGXrGmB4HU4HHkuXrRZ (Click to go to pandadoc->) $ 0.00
Sent out without a signing link - click on the PandaDoc Document ID Link to add the recipient and send for signing
Wednesday, November 26, 2025 9:28:34 AM document.sent
Wednesday, November 26, 2025 10:06:25 AM document.viewed

---------------



































Old Proposals Sent out previously:

Sent Item # 3399

Date/Time Submitted Sent By PandaDoc Document ID Link Result Grand Total At the Time
Wednesday, November 26, 2025 8:47:36 AM mikegarcia@atpslandscaping.com 4UgR9BrUEkt8cwbvQx8dAR (Click to go to pandadoc->) failed $ 0.00
Sent out without a signing link - click on the PandaDoc Document ID Link to add the recipient and send for signing

---------------










Warning! Hitting the below buttons will lock the bid.

Lock Bid and generate proposal on Pandadoc (You will still have to go to pandadoc and send it manually)


Lock Bid and generate proposal with copy-pasteable link (this is also the one for the new signing platform)








Lock the bid

Unlock the bid - Admin Only




Create Bid Price Lock Item - Admin Only








Bid Details

Bid Copied (Don't count in bid tracking)

If this is checked, the bid will not be counted in Bid Tracking, because there is a new bid that was copied from it.

bid_copied

For Holiday Lighting Bid Only

Bid Description

For maintenance bid only


Number of Months: 0.00
Monthly Payment: 0.00

Production rate modifier. Use this to increase or decrease the production rate for everything on the entire bid.

A number higher than 1.0 will result in less labor hours.

A number from 0.0 - 1.0 will result in MORE labor hours.

HindSite

Wow! Fucking Amazing! This does nothing yet though I wonder why...

send_to_hindsite released_to_hindsite hindsite_released_date hindsite_error hindsite_error_verbose

Design Details






Awarded To

This should all get filled out automatically from the signing platform once they sign, you can change it here if it does not.


Use this dropdown as a convenience to insert someone's e-mail into the above awarded to box.

Use the "Submit Date" until told otherwise.





ProfitSeeker!

Run a script to see what the totals will be for each possible percent, useful if you want to stay within the customer's budget:

ProfitSeeker! (Takes a few minutes, don't leave the page!)




MOB Calculator Step-Through

Use this to debug the cost of the MOB.

Scope: Rooflines and Gables

1. Total labor hours for everything outside of MOB items: 5.08

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (5.08) / Productive_Hours_Per_Day 7.000 = 0.7257142857142857142857142857

4. ROUNDUP(0.7257142857142857142857142857) = 1

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 1 * Travel_Time_Per_Day (0.50) *2 = 1.00 Hours of MOB



Scope: garland

1. Total labor hours for everything outside of MOB items: 2.67

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (2.67) / Productive_Hours_Per_Day 7.000 = 0.3814285714285714285714285714

4. ROUNDUP(0.3814285714285714285714285714) = 1

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 1 * Travel_Time_Per_Day (0.50) *2 = 1.00 Hours of MOB



Scope: shrubs

1. Total labor hours for everything outside of MOB items: 1.50

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (1.50) / Productive_Hours_Per_Day 7.000 = 0.2142857142857142857142857143

4. ROUNDUP(0.2142857142857142857142857143) = 1

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 1 * Travel_Time_Per_Day (0.50) *2 = 1.00 Hours of MOB






Salesman Text Blurb

 

Editable PDF Text Blurb


Copy-pastable Original Text Blurb

Note, this area does not auto-reload, if you just added a line-item, please reload the page

If there is a new generated item that is not in the above text, it is highlighted in red.

Click here to dump below text into above box (Remember to hit save, lower right corner)

Rooflines and Gables
• Provide and install up to 100 LF of C9 , 12" spacing roofline, per mapping to
• Provide and install up to 1 Holiday Light Timer
• Provide and install up to 50 LF of Blank wire as needed
• Provide and install up to 10 additional connections


garland
• Provide and install 8 9’ pre-lit garland, per mapping to


shrubs
• Provide XXXXXXXXX (ADD Misc Description) Shrub Net Lighting
• Provide 1.00 of labor for installation of existing decor
Installation of a 0.00 SF attached/detached rough cut cedar pergola to include:
-Constructed of rough sawn cut cedar
6" by 6" posts, 2" by 12" beams, 2" by 8" joists, 2" by 4" purlins
Beams to have approximately 18" overhang, joists to have approximately 16" overhang past the beams, purlins to have approximately 6" overhang on each side past joist/rafters
-Staining


Make a copy of this Bid->

This will copy the bid, with all its scopes and each item from each of those scopes, into a new bid, inside the same customer.