Create New Comment

No comments on this bid yet.



Design
0 Files
Mapping
0 Files
Pictures
0 Files
Receipts
0 Files
Subcontractors
0 Files





Special Excel Upload Only (Do Not Use)
0 Files

To upload a file, click on a folder above (such as "Design").

 

Images/Files from all other bids from this customer

Design
0 Files
Mapping
0 Files
Pictures
0 Files
Receipts
0 Files
Subcontractors
0 Files

TODO: Charts can go here (wait for when we do the reports, and steal the partial view)

I hear it's amazing when the famous purple stuffed worm in flap-jaw space with the tuning fork does a raw blink on Hara-Kiri Rock. I need scissors! 61!

Episode 1 New York. Here in the city where dreams come true and desires rule, something is being bought, sold and thrown away, even as we speak. But behind the scenes of business as usual, the nefarious "J.E. (Junker Expensive Corporation)" lines its already bloated coffers with profits from worthless products. As J.E. swindlers yet another innocent into purchasing high-priced junk, the FBI mobilizes a top-secret task force to put a stop to the menace. Now, the city's best-kept secret spy is out there, briefed and ready to protect the people from "J.E.," the catalogue of conspiracy -- just call him "2.5 (Two-point-five)."

Submit History




Signing platform: Don't use this until Justin says it is ready.

Click here to replace signing links with the new signing platform (you have to do this every time)


Latest proposal sent out:




Warning! Hitting the below buttons will lock the bid.

Lock Bid and generate proposal on Pandadoc (You will still have to go to pandadoc and send it manually)


Lock Bid and generate proposal with copy-pasteable link (this is also the one for the new signing platform)








Lock the bid

Unlock the bid - Admin Only




Create Bid Price Lock Item - Admin Only








Bid Details

Bid Copied (Don't count in bid tracking)

If this is checked, the bid will not be counted in Bid Tracking, because there is a new bid that was copied from it.

bid_copied

Bid Description

For maintenance bid only


Number of Months: 0.00
Monthly Payment: 0.00

Production rate modifier. Use this to increase or decrease the production rate for everything on the entire bid.

A number higher than 1.0 will result in less labor hours.

A number from 0.0 - 1.0 will result in MORE labor hours.

HindSite

Wow! Fucking Amazing! This does nothing yet though I wonder why...

send_to_hindsite released_to_hindsite hindsite_released_date hindsite_error hindsite_error_verbose

Design Details






Awarded To

This should all get filled out automatically from the signing platform once they sign, you can change it here if it does not.


Use this dropdown as a convenience to insert someone's e-mail into the above awarded to box.

Use the "Submit Date" until told otherwise.





ProfitSeeker!

Run a script to see what the totals will be for each possible percent, useful if you want to stay within the customer's budget:

ProfitSeeker! (Takes a few minutes, don't leave the page!)




MOB Calculator Step-Through

Use this to debug the cost of the MOB.

Scope: concrete patio

1. Total labor hours for everything outside of MOB items: 0

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (0) / Productive_Hours_Per_Day 7.000 = 0

4. ROUNDUP(0) = 0

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 0 * Travel_Time_Per_Day (0.50) *2 = 0.00 Hours of MOB



Scope: landscape

1. Total labor hours for everything outside of MOB items: 26.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (26.00) / Productive_Hours_Per_Day 7.000 = 3.7142857142857142857142857143

4. ROUNDUP(3.7142857142857142857142857143) = 4

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 4 * Travel_Time_Per_Day (0.50) *2 = 4.00 Hours of MOB



Scope: firepit

1. Total labor hours for everything outside of MOB items: 0.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (0.00) / Productive_Hours_Per_Day 7.000 = 0

4. ROUNDUP(0) = 0

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 0 * Travel_Time_Per_Day (0.50) *2 = 0.00 Hours of MOB



Scope: pergola

1. Total labor hours for everything outside of MOB items: 0

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (0) / Productive_Hours_Per_Day 7.000 = 0

4. ROUNDUP(0) = 0

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 0 * Travel_Time_Per_Day (0.50) *2 = 0.00 Hours of MOB



Scope: irr

1. Total labor hours for everything outside of MOB items: 20.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (20.00) / Productive_Hours_Per_Day 7.000 = 2.8571428571428571428571428571

4. ROUNDUP(2.8571428571428571428571428571) = 3

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 3 * Travel_Time_Per_Day (0.50) *2 = 3.00 Hours of MOB



Scope: plants

1. Total labor hours for everything outside of MOB items: 12.53

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (12.53) / Productive_Hours_Per_Day 7.000 = 1.79

4. ROUNDUP(1.79) = 2

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 2 * Travel_Time_Per_Day (0.50) *2 = 2.00 Hours of MOB



Scope: skirting

1. Total labor hours for everything outside of MOB items: 0

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (0) / Productive_Hours_Per_Day 7.000 = 0

4. ROUNDUP(0) = 0

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 0 * Travel_Time_Per_Day (0.50) *2 = 0.00 Hours of MOB



Scope: fence

1. Total labor hours for everything outside of MOB items: 0

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (0) / Productive_Hours_Per_Day 7.000 = 0

4. ROUNDUP(0) = 0

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 0 * Travel_Time_Per_Day (0.50) *2 = 0.00 Hours of MOB






Salesman Text Blurb

 

Editable PDF Text Blurb


Copy-pastable Original Text Blurb

Note, this area does not auto-reload, if you just added a line-item, please reload the page

If there is a new generated item that is not in the above text, it is highlighted in red.

Click here to dump below text into above box (Remember to hit save, lower right corner)

All irrigation are done on a time and material basis of $95.00 per man hour plus materials.
concrete patio
- Installation of 600 square feet of 4" thick concrete (grey with broom finish)
- Installation of 230 square feet of 4" thick concrete (grey with broom finish)


landscape
- Installation of 28.00 tons of black granite breeze
- Installation of 1920 square feet of landscape fabric
- Installation of 280 linear feet of metal roll top edging
Installation of 4.00 yards of choice brown mulch
- Installation of 17.50 tons of 1-1/2" black granite river rock


firepit
- Installation of 0 gas line
- Installation of 0 square feet of landscape fabric


pergola
路 Constructed of rough sawn cut cedar 路 6" by 6" posts, 2" by 12" beams, 2" by 8" joists, 2" by 4" purlins 路 Beams to have approximately 18" overhang, joists to have approximately 16" overhang past the beams, purlins to have approximately 6" overhang on each side past joist/rafters


irr
- Installation of 2080 SQFT of blue grass sod
- Rototilling
- Installation of final grade
- Installation of 7.00 yards of compost
路PVC mainline 路Schedule 80 manifolds- Rotor style irrigation heads with drip irrigation / no drip included
- Installation of drip irrigation


plants
- Installation of 3 - 2.5" caliper trees
- Installation of 8 - 15 gallon trees
- Installation of 9 - 5 gallon shrubs
- Installation of 23 - 1 gallon perennials


skirting


fence
- Installation of 30 linear feet of 6" cedar privacy fence
- Staining
- Installation of 1 - 4' wide gate


Make a copy of this Bid->

This will copy the bid, with all its scopes and each item from each of those scopes, into a new bid, inside the same customer.