Fireplace insert. https://montanafirepits.com/product/outdoor-fireplace-kit-for-36-openings-or-larger-crossfire-brass-burner-system/?gad_source=1&gad_campaignid=22308358740&gclid=EAIaIQobChMIp8-Hp8PvkAMVUDhECB0CvAyhEAQYBiABEgKA_PD_BwE
- derrickbleeker@atpslandscaping.com , Tuesday, December 2, 2025 - 1:49:52 PM
Sod is bid for a premium. 2026 prices has someone else to install for .17/ SF which would be easily covered in this bid.
- derrickbleeker@atpslandscaping.com , Tuesday, December 2, 2025 - 1:58:41 PM
Irrigation Bid for Install to install everything except master valve, flow sensor, and controller. Service to install the latter
- derrickbleeker@atpslandscaping.com , Tuesday, December 2, 2025 - 2:29:58 PM
Create New Comment
Fireplace insert. https://montanafirepits.com/product/outdoor-fireplace-kit-for-36-openings-or-larger-crossfire-brass-burner-system/?gad_source=1&gad_campaignid=22308358740&gclid=EAIaIQobChMIp8-Hp8PvkAMVUDhECB0CvAyhEAQYBiABEgKA_PD_BwE
- derrickbleeker@atpslandscaping.com , Tuesday, December 2, 2025 - 1:49:52 PM

Click here to toggle this as a critical note

Sod is bid for a premium. 2026 prices has someone else to install for .17/ SF which would be easily covered in this bid.
- derrickbleeker@atpslandscaping.com , Tuesday, December 2, 2025 - 1:58:41 PM

Click here to toggle this as a critical note

Irrigation Bid for Install to install everything except master valve, flow sensor, and controller. Service to install the latter
- derrickbleeker@atpslandscaping.com , Tuesday, December 2, 2025 - 2:29:58 PM

Click here to toggle this as a critical note

Design
0 Files
Mapping
0 Files
Pictures
0 Files
Receipts
0 Files
Subcontractors
4 Files

5ab23ea3-0ccb-4bca-a1e2-e4a1abc12b52FrisbieJL_Proposal- Pool.pdf - Bid ID: # 17355

Click to download 5ab23ea3-0ccb-4bca-a1e2-e4a1abc12b52FrisbieJL_Proposal- Pool.pdf


f6eae0a0-fc61-4bc1-8729-bd551288431cGas Conneciton Proposal #9902.pdf - Bid ID: # 17355

Click to download f6eae0a0-fc61-4bc1-8729-bd551288431cGas Conneciton Proposal #9902.pdf


bfb352b3-779a-452d-b920-aec4e81c9d18Q1097-Quote-20251121212646 JFI.pdf - Bid ID: # 17355

Click to download bfb352b3-779a-452d-b920-aec4e81c9d18Q1097-Quote-20251121212646 JFI.pdf


f4c517b9-7db0-4420-bf62-7e3dc665a15aallamericanmasonryllc_estimate_1771.pdf - Bid ID: # 17355

Click to download f4c517b9-7db0-4420-bf62-7e3dc665a15aallamericanmasonryllc_estimate_1771.pdf






Special Excel Upload Only (Do Not Use)
0 Files

To upload a file, click on a folder above (such as "Design").

 

Images/Files from all other bids from this customer

Design
0 Files
Mapping
0 Files
Pictures
0 Files
Receipts
0 Files
Subcontractors
0 Files

TODO: Charts can go here (wait for when we do the reports, and steal the partial view)

I hear it's amazing when the famous purple stuffed worm in flap-jaw space with the tuning fork does a raw blink on Hara-Kiri Rock. I need scissors! 61!

Episode 1 New York. Here in the city where dreams come true and desires rule, something is being bought, sold and thrown away, even as we speak. But behind the scenes of business as usual, the nefarious "J.E. (Junker Expensive Corporation)" lines its already bloated coffers with profits from worthless products. As J.E. swindlers yet another innocent into purchasing high-priced junk, the FBI mobilizes a top-secret task force to put a stop to the menace. Now, the city's best-kept secret spy is out there, briefed and ready to protect the people from "J.E.," the catalogue of conspiracy -- just call him "2.5 (Two-point-five)."

Submit History




Signing platform: Don't use this until Justin says it is ready.

Click here to replace signing links with the new signing platform (you have to do this every time)


Latest proposal sent out:

Sent Item # 3402

Date/Time Submitted Sent By PandaDoc Document ID Link Result Grand Total At the Time
Tuesday, December 2, 2025 3:10:29 PM derrickbleeker@atpslandscaping.com d55Xf9XdEDr95cCGrmGbNA (Click to go to pandadoc->) $ 0.00
Sent out without a signing link - click on the PandaDoc Document ID Link to add the recipient and send for signing
Tuesday, December 2, 2025 3:34:18 PM document.sent
Tuesday, December 2, 2025 3:34:52 PM document.viewed
Wednesday, December 3, 2025 10:58:22 AM document.completed
Wednesday, December 3, 2025 10:58:22 AM document.completed
Wednesday, December 3, 2025 10:58:27 AM document.completed

---------------










Warning! Hitting the below buttons will lock the bid.

Lock Bid and generate proposal on Pandadoc (You will still have to go to pandadoc and send it manually)


Lock Bid and generate proposal with copy-pasteable link (this is also the one for the new signing platform)








Lock the bid

Unlock the bid - Admin Only




Create Bid Price Lock Item - Admin Only








Bid Details

Bid Copied (Don't count in bid tracking)

If this is checked, the bid will not be counted in Bid Tracking, because there is a new bid that was copied from it.

bid_copied

Bid Description

For maintenance bid only


Number of Months: 0.00
Monthly Payment: 0.00

Production rate modifier. Use this to increase or decrease the production rate for everything on the entire bid.

A number higher than 1.0 will result in less labor hours.

A number from 0.0 - 1.0 will result in MORE labor hours.

HindSite

Wow! Fucking Amazing! This does nothing yet though I wonder why...

send_to_hindsite released_to_hindsite hindsite_released_date hindsite_error hindsite_error_verbose

Design Details






Awarded To

This should all get filled out automatically from the signing platform once they sign, you can change it here if it does not.


Use this dropdown as a convenience to insert someone's e-mail into the above awarded to box.

Use the "Submit Date" until told otherwise.





ProfitSeeker!

Run a script to see what the totals will be for each possible percent, useful if you want to stay within the customer's budget:

ProfitSeeker! (Takes a few minutes, don't leave the page!)




MOB Calculator Step-Through

Use this to debug the cost of the MOB.

Scope: Demo & Prep

1. Total labor hours for everything outside of MOB items: 38.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (38.00) / Productive_Hours_Per_Day 6.000 = 6.3333333333333333333333333333

4. ROUNDUP(6.3333333333333333333333333333) = 7

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 7 * Travel_Time_Per_Day (1.00) *2 = 14.00 Hours of MOB



Scope: Pool

1. Total labor hours for everything outside of MOB items: 0

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (0) / Productive_Hours_Per_Day 6.000 = 0

4. ROUNDUP(0) = 0

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 0 * Travel_Time_Per_Day (1.00) *2 = 0.00 Hours of MOB



Scope: Pavers & Stairs

1. Total labor hours for everything outside of MOB items: 200.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (200.00) / Productive_Hours_Per_Day 6.000 = 33.333333333333333333333333333

4. ROUNDUP(33.333333333333333333333333333) = 34

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 34 * Travel_Time_Per_Day (1.00) *2 = 68.00 Hours of MOB



Scope: Sod

1. Total labor hours for everything outside of MOB items: 39.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (39.00) / Productive_Hours_Per_Day 6.000 = 6.5

4. ROUNDUP(6.5) = 7

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 7 * Travel_Time_Per_Day (1.00) *2 = 14.00 Hours of MOB



Scope: Mulch, Edging, Rock

1. Total labor hours for everything outside of MOB items: 71.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (71.00) / Productive_Hours_Per_Day 6.000 = 11.833333333333333333333333333

4. ROUNDUP(11.833333333333333333333333333) = 12

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 12 * Travel_Time_Per_Day (1.00) *2 = 24.00 Hours of MOB



Scope: Lights

1. Total labor hours for everything outside of MOB items: 20.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (20.00) / Productive_Hours_Per_Day 6.000 = 3.3333333333333333333333333333

4. ROUNDUP(3.3333333333333333333333333333) = 4

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 4 * Travel_Time_Per_Day (1.00) *2 = 8.00 Hours of MOB



Scope: Water Feature Stream

1. Total labor hours for everything outside of MOB items: 67.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (67.00) / Productive_Hours_Per_Day 6.000 = 11.166666666666666666666666667

4. ROUNDUP(11.166666666666666666666666667) = 12

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 12 * Travel_Time_Per_Day (1.00) *2 = 24.00 Hours of MOB



Scope: East Water Feature

1. Total labor hours for everything outside of MOB items: 27.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (27.00) / Productive_Hours_Per_Day 6.000 = 4.5

4. ROUNDUP(4.5) = 5

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 5 * Travel_Time_Per_Day (1.00) *2 = 10.00 Hours of MOB



Scope: Plants

1. Total labor hours for everything outside of MOB items: 25.76

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (25.76) / Productive_Hours_Per_Day 6.000 = 4.2933333333333333333333333333

4. ROUNDUP(4.2933333333333333333333333333) = 5

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 5 * Travel_Time_Per_Day (1.00) *2 = 10.00 Hours of MOB



Scope: Irrigation

1. Total labor hours for everything outside of MOB items: 40.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (40.00) / Productive_Hours_Per_Day 6.000 = 6.6666666666666666666666666667

4. ROUNDUP(6.6666666666666666666666666667) = 7

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 7 * Travel_Time_Per_Day (1.00) *2 = 14.00 Hours of MOB



Scope: Fireplace/Wing Walls

1. Total labor hours for everything outside of MOB items: 4.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (4.00) / Productive_Hours_Per_Day 6.000 = 0.6666666666666666666666666667

4. ROUNDUP(0.6666666666666666666666666667) = 1

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 1 * Travel_Time_Per_Day (1.00) *2 = 2.00 Hours of MOB



Scope: Deck, Stairs, Under-Decking

1. Total labor hours for everything outside of MOB items: 0

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (0) / Productive_Hours_Per_Day 6.000 = 0

4. ROUNDUP(0) = 0

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 0 * Travel_Time_Per_Day (1.00) *2 = 0.00 Hours of MOB



Scope: Gas Line & Electric

1. Total labor hours for everything outside of MOB items: 16.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (16.00) / Productive_Hours_Per_Day 6.000 = 2.6666666666666666666666666667

4. ROUNDUP(2.6666666666666666666666666667) = 3

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 3 * Travel_Time_Per_Day (1.00) *2 = 6.00 Hours of MOB






Salesman Text Blurb

 

Editable PDF Text Blurb


Copy-pastable Original Text Blurb

Note, this area does not auto-reload, if you just added a line-item, please reload the page

If there is a new generated item that is not in the above text, it is highlighted in red.

Click here to dump below text into above box (Remember to hit save, lower right corner)

All irrigation are done on a time and material basis of $95.00 per man hour plus materials.
Demo & Prep
- Demo, haul off, and disposal of 12599 square feet of existing landscape
- Demo, haul off, and disposal of 3000 square feet of existing landscape


Pool


Pavers & Stairs
- Installation of 1775 square feet of pavers (color TBD)
- Installation of 24 bags of polymeric sand
- Installation of 8 tons of sand for base material
- Installation of 67 tons of road base for base material
- Installation of 185 square feet of 4" thick concrete (grey with broom finish)


Sod
- Installation of 11026 SQFT of blue grass sod
- Rototilling
- Establishment of final grade
- Installation of 34.00 yards of compost


Mulch, Edging, Rock
- Installation of 1433 linear feet of metal roll top edging
- Installation of 45.50 yards of shredded redwood mulch
- Installation of 6010 square feet of landscape fabric
- Installation of 35.00 tons of black granite boulders
- Installation of 14.00 tons of 3"-6" grand mesa river rock


Lights


Water Feature Stream
- Installation of 400 square feet of 40 MIL EPDM pond liner
- Installation of 13.00 yards of topsoil for berm
- Installation of 350 square feet of landscape fabric
- Installation of 5.50 tons of 2"-4" horizon cobble


East Water Feature
- Installation of 3.00 tons of black granite boulders


Plants
- Installation of 145 - 1 gallon perennials
- Installation of 26 - 5 gallon shrubs
- Installation of 1 - 2.5" caliper trees
- Installation of 3 - 15 gallon trees


Irrigation
·PVC mainline ·Schedule 80 manifolds- Rotor style irrigation heads with drip irrigation / no drip included
- Installation of a new irrigation controller


Fireplace/Wing Walls


Deck, Stairs, Under-Decking


Gas Line & Electric


Make a copy of this Bid->

This will copy the bid, with all its scopes and each item from each of those scopes, into a new bid, inside the same customer.