Create New Comment

No comments on this bid yet.



Design
0 Files
Mapping
0 Files
Pictures
0 Files
Receipts
0 Files
Subcontractors
0 Files





Special Excel Upload Only (Do Not Use)
0 Files

To upload a file, click on a folder above (such as "Design").

 

Images/Files from all other bids from this customer

Design
0 Files
Mapping
0 Files
Pictures
0 Files
Receipts
0 Files
Subcontractors
0 Files

TODO: Charts can go here (wait for when we do the reports, and steal the partial view)

I hear it's amazing when the famous purple stuffed worm in flap-jaw space with the tuning fork does a raw blink on Hara-Kiri Rock. I need scissors! 61!

Episode 1 New York. Here in the city where dreams come true and desires rule, something is being bought, sold and thrown away, even as we speak. But behind the scenes of business as usual, the nefarious "J.E. (Junker Expensive Corporation)" lines its already bloated coffers with profits from worthless products. As J.E. swindlers yet another innocent into purchasing high-priced junk, the FBI mobilizes a top-secret task force to put a stop to the menace. Now, the city's best-kept secret spy is out there, briefed and ready to protect the people from "J.E.," the catalogue of conspiracy -- just call him "2.5 (Two-point-five)."

Submit History




Signing platform: Don't use this until Justin says it is ready.

Click here to replace signing links with the new signing platform (you have to do this every time)


Latest proposal sent out:

Sent Item # 3411

Date/Time Submitted Sent By PandaDoc Document ID Link Result Grand Total At the Time
Friday, December 5, 2025 9:33:33 AM mikegarcia@atpslandscaping.com FiQTwGe5WpU5Z3yqUDJsVb (Click to go to pandadoc->) $ 0.00
Sent out without a signing link - click on the PandaDoc Document ID Link to add the recipient and send for signing
Friday, December 5, 2025 9:39:35 AM document.sent
Friday, December 5, 2025 9:53:12 AM document.viewed
Monday, December 8, 2025 3:07:30 PM document.completed
Monday, December 8, 2025 3:07:31 PM document.completed
Monday, December 8, 2025 3:07:35 PM document.completed

---------------










Warning! Hitting the below buttons will lock the bid.

Lock Bid and generate proposal on Pandadoc (You will still have to go to pandadoc and send it manually)


Lock Bid and generate proposal with copy-pasteable link (this is also the one for the new signing platform)








Lock the bid

Unlock the bid - Admin Only




Create Bid Price Lock Item - Admin Only








Bid Details

Bid Copied (Don't count in bid tracking)

If this is checked, the bid will not be counted in Bid Tracking, because there is a new bid that was copied from it.

bid_copied

Bid Description

For maintenance bid only


Number of Months: 0.00
Monthly Payment: 0.00

Production rate modifier. Use this to increase or decrease the production rate for everything on the entire bid.

A number higher than 1.0 will result in less labor hours.

A number from 0.0 - 1.0 will result in MORE labor hours.

HindSite

Wow! Fucking Amazing! This does nothing yet though I wonder why...

send_to_hindsite released_to_hindsite hindsite_released_date hindsite_error hindsite_error_verbose

Design Details






Awarded To

This should all get filled out automatically from the signing platform once they sign, you can change it here if it does not.


Use this dropdown as a convenience to insert someone's e-mail into the above awarded to box.

Use the "Submit Date" until told otherwise.





ProfitSeeker!

Run a script to see what the totals will be for each possible percent, useful if you want to stay within the customer's budget:

ProfitSeeker! (Takes a few minutes, don't leave the page!)




MOB Calculator Step-Through

Use this to debug the cost of the MOB.

Scope: Putting Green

1. Total labor hours for everything outside of MOB items: 37.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (37.00) / Productive_Hours_Per_Day 6.000 = 6.1666666666666666666666666667

4. ROUNDUP(6.1666666666666666666666666667) = 7

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 7 * Travel_Time_Per_Day (1.00) *2 = 14.00 Hours of MOB



Scope: water feature

1. Total labor hours for everything outside of MOB items: 0

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (0) / Productive_Hours_Per_Day 6.000 = 0

4. ROUNDUP(0) = 0

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 0 * Travel_Time_Per_Day (1.00) *2 = 0.00 Hours of MOB



Scope: breeze

1. Total labor hours for everything outside of MOB items: 8.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (8.00) / Productive_Hours_Per_Day 6.000 = 1.3333333333333333333333333333

4. ROUNDUP(1.3333333333333333333333333333) = 2

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 2 * Travel_Time_Per_Day (1.00) *2 = 4.00 Hours of MOB



Scope: New Turf & Irrigation

1. Total labor hours for everything outside of MOB items: 22.00

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (22.00) / Productive_Hours_Per_Day 6.000 = 3.6666666666666666666666666667

4. ROUNDUP(3.6666666666666666666666666667) = 4

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 4 * Travel_Time_Per_Day (1.00) *2 = 8.00 Hours of MOB



Scope: plants

1. Total labor hours for everything outside of MOB items: 9.08

2. Formula = (ROUNDUP(Total_Labor_Hours / Productive_Hours_Per_Day,0) * Travel_Time_Per_Day * 2))

3. Total_Labor_Hours (9.08) / Productive_Hours_Per_Day 6.000 = 1.5133333333333333333333333333

4. ROUNDUP(1.5133333333333333333333333333) = 2

ROUNDUP is an excel function that brings a decimal up to the closest whole integer.

5. 2 * Travel_Time_Per_Day (1.00) *2 = 4.00 Hours of MOB






Salesman Text Blurb

 

Editable PDF Text Blurb


Copy-pastable Original Text Blurb

Note, this area does not auto-reload, if you just added a line-item, please reload the page

If there is a new generated item that is not in the above text, it is highlighted in red.

Click here to dump below text into above box (Remember to hit save, lower right corner)

All irrigation are done on a time and material basis of $95.00 per man hour plus materials.
Putting Green
- Installation of 15 tons of breeze for base material
- Installation of 800 square feet of artificial turf
- Installation of 0 square feet of landscape fabric
- Installation of 6.75 tons of breeze for base material
- Installation of 400 square feet of artificial turf


water feature


breeze
- Installation of 16.50 tons of grey breeze
- Installation of 120 linear feet of metal roll top edging
- Installation of 1623 square feet of landscape fabric


New Turf & Irrigation
- Installation of 3240 SQFT of blue grass sod
- Rototilling
- Installation of final grade
- Installation of 10.00 yards of compost
- Installation of 155 linear feet of metal roll top edging
·PVC mainline ·Schedule 80 manifolds- Rotor style irrigation heads with drip irrigation / no drip included
- Installation of a new irrigation controller
- Installation of drip irrigation
- Demo, haul off, and disposal of 1500 square feet of existing landscape


plants
Installation of 2 - 2" caliper trees
- Installation of 6 - 5 gallon shrubs
- Installation of 0 square feet of landscape fabric


Make a copy of this Bid->

This will copy the bid, with all its scopes and each item from each of those scopes, into a new bid, inside the same customer.